Show the application of concrete crash barriers, Civil Engineering

Assignment Help:

Q. Show the application of Concrete crash barriers?

Concrete crash barriers aren't considered as the best barrier design due to the following reasons when compared with flexible barriers:

(i)  Concrete barriers possess rough surface that, when impacted by moving vehicles, tend to cause significant damage to the vehicles.

(ii) Because concrete is a rigid material and deceleration of collided vehicles is relatively large when compared with flexible barriers.

Though concrete crash barriers have particular application in locations where deflection of barriers isn't allowed. For example in the central divider of a carriageway, if flexible barriers are adopted and vehicles crush into the barriers, deformation resulting from the hitting of vehicles will result in an intrusion to the adjacent carriageway. This is undesirable since this can trigger further collisions in the adjacent carriageway and therefore rigid barriers such as concrete crash barriers must be adopted in this scenario.


Related Discussions:- Show the application of concrete crash barriers

Explain the selected bridges - underwater inspection, Explain the Selected ...

Explain the Selected Bridges - Underwater Inspection? Those bridges, which require underwater inspection must be noted for individual inspection and inventory records as well b

Softening point of bitumen, Hi, i need discussion for softening point of bi...

Hi, i need discussion for softening point of bitumen 7.5 ?C

Determine the basic concepts of prestressing, Determine the Basic Concepts...

Determine the Basic Concepts  of Prestressing In the year 1904, Freyssinet tried to introduce prestresses in concrete to resist stresses developed due to external loads. Later,

What do you mean by laying of apron in design of bridge, Q. What do you mea...

Q. What do you mean by Laying of apron in design of bridge? Width of apron laid on river bed should be 1.5 D1 where D 1 is estimated scour depth in metres below river bed. Thi

Process of lubrication of girder bearing, Q. Process of Lubrication of Gird...

Q. Process of Lubrication of Girder Bearing? Oiling and greasing of bearings is done to ensure that the bearings are well lubricated and working freely to permit expansion and

Paint system to protect steelwork from corrosion, Q. Paint system to protec...

Q. Paint system to protect steelwork from corrosion? In a typical painting system, there are generally three main layers primer, undercoat and finishing coat. Primer acts as th

Timber, seasoning of timber

seasoning of timber

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Calculate uniform annual cost for maintenance and repair, A contractor purc...

A contractor purchased a Caterpillar D-13 dozer for $100,000 and owned it for five years. The annual cost for maintenance and repair is provided in the Table. With annual interest

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd