Show construction subcontractor responsibilities, Mechanical Engineering

Assignment Help:

Q. Show Construction Subcontractor Responsibilities?

The Supplier or Construction Subcontractor is responsible for:

• Employing qualified PMI technicians

• Performing PMI testing to approved procedures

• Performing PMI tests and or additional support, if needed to ensure correct materials are used.

• Ensuring all alloy materials used for fabrication (supplier) or construction (subcontractor) are properly identified after PMI testing and have the proper supporting PMI documentation.

• Ensuring timely replacement of any identified suspect material.


Related Discussions:- Show construction subcontractor responsibilities

FEED WATER PUMP, #what is the ratio between thirst pr. and discharge pr.? ....

#what is the ratio between thirst pr. and discharge pr.? ..

Convection internal flows, #queConsider laminar flow in a circular tubewith...

#queConsider laminar flow in a circular tubewith a fully developed velocity profile.Let the heat be added at a constant rate along the tube from x+ =0 to x+ =0.10 . Thereafter ,

Organisation set-up - construction of railway line, Organisation set-up: ...

Organisation set-up: The civil engineering department of the Railways is responsible for the maintenance of railway lines. The maintenance organisation consists of Chief Engi

Determine the actual average pressure, A multiple disc clutch, steel on bro...

A multiple disc clutch, steel on bronze, is to transmit 4.5 kW at 750 r.p.m. The inner radius of contact is 40mm and outer radius of the contact is 70 mm. The clutch operates in oi

Air standard cycles - thermodynamics, AIR STANDARD CYCLES - thermodynamics:...

AIR STANDARD CYCLES - thermodynamics: Most of the power plant operates in the thermodynamic cycle that is the working fluid undergoes a series of processes and returns to its

What is wire-frame, What is Wire-frame Wire-frame models use the simpl...

What is Wire-frame Wire-frame models use the simplest data structures and they are ambiguous. Wire frame is a well-known example that consists of 16 vertices and 32 edges. We

Codes and standards for steam generator, Codes and Standards for steam gene...

Codes and Standards for steam generator All equipment purchased, and installation work done, shall be in accordance with the: • Canadian Electrical Code • Alberta Electri

Computer aided visualization, There are various methods to visualize the ...

There are various methods to visualize the design process which can be summarized as given below: a. An automated drafting tool and presentation of graphics. b. A means

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd