Q. Show Afflux and scour in alluvial rivers?
In case of alluvial rivers, the river bed comprises scourable material like sand. Constriction of bridge waterway causes increase in discharge intensity and increase in velocity which result in bed scour. Scour in riverbed increases the depth of flow and reduces velocity and hence the scouring capacity.
When excess of sediment transporting capacity in the constriction beyond normal capacity in unconstricted reach is neutralised by progressive bed scour during rising flood of a hydrograph, no further scour occurs. This depth with full scour approximates normal scour depth in the same river adjusted for the increased discharge intensity on account of constriction.
What is WBM road. How it is constructed?
while designing the lug angles with the channel section what does "the force not acccounted for by the direct connection of member" mean?
types of staircases.
A concrete wall form tie with an ultimate strength capacity of 2,400-lbs is designed for use in a concrete wall form with an 18-in center to center spacing. During formwork inspect
Explain briefly physical classifications of stone
Explain the Secondary treatment for wastewater Secondary Treatment: to remove soluble BOD that escapes the primary treatment and to provide added removal of suspended solids.
HOW CAN I INVESTIGATE THE PROPERTIES UNBURNT COMPRESSED CLAY BRICKS AND STABILIZED UNBURNT COMPRESSED BRICKS.
Compute the safe bearing capacity of a square footing 1.5 m × 1.5 m, located at a depth of 1 m below the ground level in a soil of average density 20 kN/m 3 . = 20°, N c = 17.7,
Question What is the major purpose of carrying out water absorption test for precast concrete pipes? Answer Cement will mix with additional water than is compulsory t
1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft. The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd