Shoes are generally installed in prefabricated drains for the below :

(i)  It avoids the entry of soils in the mandrel by sealing it at the time of installation of drains.

(ii) It performs just like an anchor to retain the drains at designed depth and to stop the drains from being pulled out at the time of withdrawn of mandrels after driving the mandrels in ground. 

Though the inclusion of shoes in prefabricated drains tends to aggravate the problem of smear effect since shoes are normally larger in size than mandrels.


Related Discussions:- Shoes of prefabricated drains

Part time job online, These days in Portugal is really difficult to get a j...

These days in Portugal is really difficult to get a job. So my question, is there any company that have online jobs in designing and calculating structures?

Fluid mechanics , i have three civil engineering fluid mechanics. 1 manomet...

i have three civil engineering fluid mechanics. 1 manometer problem 2 estimate the discharge for a channel 3 pipe system - direction of flow in line and what the value of flow in l

Concrete compaction in piling works, Question What is the reason that v...

Question What is the reason that vibrators not used in concrete compaction in piling works ? Answer Concrete for piles must be a high-slump self-compacting mix that i

Wet mix Macadam, Test required before laying or after laying.

Test required before laying or after laying.

Chain surveying, Chain Surveying: In the chain surveying, you have stu...

Chain Surveying: In the chain surveying, you have studied the basics of chain surveying. In chain surveying, various equipment and instruments are used for measuring distances

3 wire leveling, can you give me some examples and problems in 3-wire level...

can you give me some examples and problems in 3-wire leveling?

FOUNDATION, TYPE OF FOUNDATION IN LATERITE SOIL

TYPE OF FOUNDATION IN LATERITE SOIL

Addition of water to bored piles, Addition of water to bored piles In ...

Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd