Shear lag in typical box-girder bridge
For multiple-cell box girders, there are normally two arrangements. First one is that independent cells are connected by their top flanges only while the other one is that the cells are connected both at bottom and top flanges. From structural point of view, it's recommended to adopt the second arrangement. For the case of cells associated by top flanges only, their flanges are heavily stressed in transverse direction owing to flexure that can't be effectively distributed across the cross section.
In structural analysis of bridges shear lag have to be considered in design in some situations. Shear lag occurs when some parts of cross section aren't directly connected. For a box-girder bridgenot all parts of flanges are joined directly to webs so that connected part becomes highly stressed whereas unconnected flanges aren't fully stressed. Particularly for wide flanges of box-girder bridges axial loads are transferred by shear from webs to flanges that result in distortion in their planes. Therefore plane sections don't stay plane and stress distribution in the flanges aren't uniform. Furthermore there is a tendency for longitudinal in-plane displacements of bride deck away from web/flange connection to lag behind those parts of bridge in close vicinity to web/flange connection.
The effect of shear lag causes longitudinal stress at flange/web connection to be higher than mean stress across the flange. Thus the effect of shear lag has to be catered for in the design of box-girder bridges specifically for those with wide flanges.
Solve the following problems related to Wastewater flow and densities (a) The volume of 896, 000 lb of wastewater is? (b) The weight of 13,000 ft3 of wastewater is? (c) A
Impact Test: Resistance of stones to impact is found by conducting tests in impacting testing machine .It contain of a frame with guides in which a metal hammer weighing 13.
How can we reduced frictional losses Frictional losses can be reduced by several methods, such as : (a) Over-tensioning the tendons by an amount equal to the maximum frictio
what are The regulations and specification that followed for compaction works for earth dam in Oman.
Major bridge - Major bridge is one of which has a total linear waterway of 18 m or more for multiple span and total linear water way of 12 m or more for single span. Important b
Q. Difference between road gullies and catch pits? Both road gullies and catchpits are the two fundamental types of drainage inlets of drainage system. However they are designe
Q. Residual stresses in steel after welding? Considerable residual stresses are persuaded in connecting steel members after welding operation. Local temperature of steel where
Applications of statics
1. Where permanent bench of india located ? 2. use of Permanent BenchMark ?
A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd