Shear lag in typical box-girder bridge
For multiple-cell box girders, there are normally two arrangements. First one is that independent cells are connected by their top flanges only while the other one is that the cells are connected both at bottom and top flanges. From structural point of view, it's recommended to adopt the second arrangement. For the case of cells associated by top flanges only, their flanges are heavily stressed in transverse direction owing to flexure that can't be effectively distributed across the cross section.
In structural analysis of bridges shear lag have to be considered in design in some situations. Shear lag occurs when some parts of cross section aren't directly connected. For a box-girder bridgenot all parts of flanges are joined directly to webs so that connected part becomes highly stressed whereas unconnected flanges aren't fully stressed. Particularly for wide flanges of box-girder bridges axial loads are transferred by shear from webs to flanges that result in distortion in their planes. Therefore plane sections don't stay plane and stress distribution in the flanges aren't uniform. Furthermore there is a tendency for longitudinal in-plane displacements of bride deck away from web/flange connection to lag behind those parts of bridge in close vicinity to web/flange connection.
The effect of shear lag causes longitudinal stress at flange/web connection to be higher than mean stress across the flange. Thus the effect of shear lag has to be catered for in the design of box-girder bridges specifically for those with wide flanges.
Q A transition curve is required for a circular curve of 200-meter Φ radius, the gauge being 1.5 m. and max super elevation restricted to 15 cm. The transition restricted to 15 cm
Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a
how to design
what is expected of them
Q. Sand cone test – suitable for all soils? Sand cone (replacement) test is generally carried out to determine the in-situ and compacted density of soils. This testing method i
Determine the example of tendon splices Following are some examples of tendon splices. (a) Torpedo splice (b) Clamp splice (c) Screw connectors
For fixed beam(say for example fixed with a point load at midspan) how did we end up getting P*L/8...??
The stresses acting on the plane of maximum shearing stress by a given point in sand are as follows: total normal stress = 250 kN/m 2 ; pore-water pressure = 88.5 kN/ m 2 ; shearin
Explain Influence lines-reactions 1. Remove the support under investigation 2. Displace the beam vertically a distance of 1 unit. The resulting beam shape will be the sha
closed traverse maths problems at list 5 station
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd