Shear lag in typical box-girder bridge, Civil Engineering

Assignment Help:

Shear lag in typical box-girder bridge

For multiple-cell box girders, there are normally two arrangements. First one is that independent cells are connected by their top flanges only while the other one is that the cells are connected both at bottom and top flanges. From structural point of view, it's recommended to adopt the second arrangement. For the case of cells associated by top flanges only, their flanges are heavily stressed in transverse direction owing to flexure that can't be effectively distributed across the cross section.

In structural analysis of bridges shear lag have to be considered in design in some situations. Shear lag occurs when some parts of cross section aren't directly connected. For a box-girder bridgenot all parts of flanges are joined directly to webs so that connected part becomes highly stressed whereas unconnected flanges aren't fully stressed. Particularly for wide flanges of box-girder bridges axial loads are transferred by shear from webs to flanges that result in distortion in their planes. Therefore plane sections don't stay plane and stress distribution in the flanges aren't uniform. Furthermore there is a tendency for longitudinal in-plane displacements of bride deck away from web/flange connection to lag behind those parts of bridge in close vicinity to web/flange connection.

The effect of shear lag causes longitudinal stress at flange/web connection to be higher than mean stress across the flange. Thus the effect of shear lag has to be catered for in the design of box-girder bridges specifically for those with wide flanges.


Related Discussions:- Shear lag in typical box-girder bridge

Explain about the pre-tensioning systems, Pre-tensioning systems In the...

Pre-tensioning systems In the previous unit we have seen different steps in a pretensioning operation. Tendon wires or strands (formed as a rope type arrangement made of  sever

Lubrication of rail joint, Lubrication of rail joints is one of the importa...

Lubrication of rail joints is one of the important items of permanent way works incidental to systematic track maintenance, the lubrication of joints is done for the following purp

Enumerate the term - superposing the stress variations, Enumerate the term ...

Enumerate the term - superposing the stress variations If the case of concentric pre-stressing is considered, we can appreciate that stress at any section of the beam is compr

Plane table, what is traversing plane table?

what is traversing plane table?

Surveying, what are tie lines? explain in detail

what are tie lines? explain in detail

Write short note on open foundation, Q. Write short note on Open Foundation...

Q. Write short note on Open Foundation? Broadly the foundation are classified into open i.e. shallow & deep foundations open as stated are shallow foundation where the soil str

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd