Sheaf or loose-leaf form, Other Management

Assignment Help:

Sheaf or Loose-Leaf Form:

Sheaf form of library catalogue is also referred to as loose-leaf form. A sheaf form of catalogue is one in which slips of paper are put into a loose-leaf binder and bound by some mechanical device into a volume. This is a loose-leaf binder format, which provides the convenience of handling a book. In the sheaf form, each entry is made on a separate slip. But, there may also be more than one entry on each slip or page. The entries are either handwritten or typed. New slips can be inserted in appropriate places without disturbing the existing order of arrangement of entries. It is also possible to remove entries for specific documents in case such documents are withdrawn from the library stock. Roughly, each volume of a sheaf catalogue may contain about 500 to 600 leaves. The volumes so constituted may be displayed on. special shelves with appropriate labels on their spines, indicating the order (either alphabetical or classified) of arrangement. At one time this form of catalogue became somewhat popular in countries like England and other European countries. 

Advantages 

a)  It is adjustable and portable which makes it easy to consult from any part of the library, 

b)  Its flexible nature renders it convenient to insert or delete entries as and when required. 

c)  It can be kept updated without much difficulty. 

d)  It is more compact and occupies less space: 

Disadvantages 

a)  Generally one slip is used to record the particulars of one document only. This leads to wastage of space on slips, which are larger in size.  

b)  If details pertaining to more than one document are entered on a single slip, it becomes necessary to rewrite the entire page. This situation results in loss of time and labour on the part of the library staff. 

c)  Libraries using sheaf catalogue cannot participate in any cooperative cataloguing scheme or use facilities such as distribution of unit cards to minimise their cataloguing work. 

d)  The catalogue has to he consulted in the library premises only. It is not possible to bring out multiple copies of this catalogue. 

e)  Loss of slips due to mishandling by readers. 


Related Discussions:- Sheaf or loose-leaf form

Explain why it is necessary to introduce the dummy activity, Question: ...

Question: The following diagram shows a C.P.A.-network modeling the stages in the construction project. Each arc is labeled with the letter denoting the activity it represents

denominators, who are those involve in denominators for desi

who are those involve in denominators for desire

Manufacturer''s authorization certificate, The Section ‘Instructions to Bid...

The Section ‘Instructions to Bidders' in the Bidding Documents for Procurement of Goods through Open Advertised Bidding is meant to guide the Bidders in submitting responsive bids

Binding section in library building in library management, Binding section ...

Binding section in library building in library management This section is generally located in the basement or some other obscure area. Machinery, material and equipment for m

What is the importance of technology diffusion, Question 1 Write a short n...

Question 1 Write a short note on technology strategy. Describe in detail about the innovation management Question 2 What is the importance of technology diffusion? What are t

Challenges faced by the estate management team, Problem: a. Describe ho...

Problem: a. Describe how Integrated Resorts can be designed and managed to comply with the Government policy of "Maurice Ile Durable". b. What are the challenges faced by t

Observation checklist - research tools, Observation Checklist/Schedule: ...

Observation Checklist/Schedule: This section Refer to the section on observation technique given in subsection which describes  the phenomenon  that can be observed and types

Develop a process map, Question Assume a large manufacturing company im...

Question Assume a large manufacturing company implemented both an ERP system and a Web ordering system. Develop a process map of the steps needed to fill a Web order. Be sure t

Top level management & stakeholder involvement in six sigma, T op level ma...

T op level management commitment and stakeholder involvement -  Six   sigma   involves   top   level   management commitment as well as stakeholder involvement. Let us go into det

Describe why planning is vital in preparing a daily plan, QUESTION 1 Ca...

QUESTION 1 Caring for differences in Early Childhood Centres has become very important. Briefly explain why QUESTION 2 Briefly describe why planning is important even i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd