Q. Settlement due to Reduction in Volume of Soil?
The weight of the structure causes reduction in volume of soil due to expulsion of pore water from the voids. This reduces the void ratio, maintaining same volume of solid particles. The effect of this decrease in volume will result in vertical downward movement of the superstructure.
The compressible soil layer under the foundation of the structure is stressed upto a large depth due to the weight of the structure. The stress will be maximum at the foundation level which will gradually decrease with depth. Hence, any compressible structure lying within the depth of the stressed zone will undergo settlement.
Settlement on sandy soil is usually less and whatever settlement has to take place occurs at fast rate. In case of cohesive soil, the settlement is usually more and the rate of settlement is also very much prolonged.
we are given a project on field.i''d like to know about how to start n proceed vd fly levelling in the field
The stresses acting on the plane of maximum shearing stress by a given point in sand are as follows: total normal stress = 250 kN/m 2 ; pore-water pressure = 88.5 kN/ m 2 ; shearin
how can i get results of this
c programme for Venturimeter
How to convert uniformly varying load to point load
What is the meaning of term -Slip in Anchorage In the case of post-tensioned concrete, when the tendons are anchored at the ends of concrete members, a slip of tendons takes
Question Why are voids filled with lightweight infilling material in raft base of pumping stations ? Answer To decrease dead load and therefore to decrease settleme
modified pratt truss with detailing in 3D
A wood pile of 10 m length is driven by a 1500 kg drop hammer falling by 3 m to a final set equal to 1.25 cm per blow. Measure the safe load on the pile using the Engineering Ne
im looking for someone to do drawing in autocad 3D 2013 with report
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd