Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Seismic Loads For Structure-Mounted Equipment?
For equipment mounted in a structure above grade, the governing equation for seismic force is:
Fp = AvCcPacWc, where Av = (a site-specific value, equipment seismic coefficient Cc=5), and performance criteria factor P=1.0.ac=1.0, except for flexible equipment such as tall slender vessels, vessels on tall legs springs, or other resilient supports. This factor is then given as follows: for Tc/T<0.6 or Tc/T>1.4, ac=1.0; for Tc/T³0.6 or Tc/T£1.4, ac=5.0.
Tc is the first natural period of the equipment, and T is the first natural period of the structure. Wc is the operating weight of the equipment. Fp is the horizontal seismic force, applied at the center of gravity of the equipment and in the direction causing the highest stresses. The design of pressure retaining elements (both internal and external) shall permit allowable stress multiplying factors.
Shop assembled, steam drum, risers, downcomers, and all other related equipment on the steam side shall be designed, fabricated and hydrostatically tested to all requirements of AS
In turning moment diagram. why we start to draw curve from o degree?
Calculate the magnitude of maximum bending moment: The shear force diagram for the overhanging beam is illustrated in Figure. Draw the loading diagram & bending moment diagram
parameters specified in a steam boiler
plate jig
Illustrate the following : a. Ash handling system b. Dust collection What are the impurities in the water and how they are replaced for use as feed water in modern thermal
(i) Formulate the equation of motion for the system shown in Figure. List TWO (2) assumptions made in this formulation. (ii) Find the response of this system at t = 3s. The syst
Explain construction and working of Rope Brake Dynamometer? Determine Power also ?
Q. Show Construction Subcontractor Responsibilities? The Supplier or Construction Subcontractor is responsible for: • Employing qualified PMI technicians • Performing PMI
relation between fluid pressure and velocity
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd