Q. Scraper Launchers and Receivers?
Scraper launchers and receivers associated with the pipelines shall be located in open, well-ventilated areas with the opening directed away from pressurized or other critical equipment, where practicable. Mechanical handling facilities shall be provided for spheres, scrapers (also commonly known as "pigs") and line logging devices.
Elevations, relative to grade, of launchers and receivers shall be kept to a minimum, but shall be of sufficient height to allow contents of drain lines to be observed. Launcher and receiver areas are located close to the main pipeline entry and exit points of the plant. The loading and unloading end of these units should point away from other facilities. This equipment should be within a curbed area with wash down facilities. As launchers and receivers are operated whilst adjacent plant is still 'live', safe spacing needs to be maintained.
Slug catchers are located close to the gas pipeline entry point to the plant and are designed to accommodate slugs of liquid that may be present in the gas supply. They can be either vessel type or for larger flows a multipipe type slug catcher can be utilized, both are generally above ground. The multipipe type can occupy a considerable plot area.
Both the launcher and receiver and slug catcher areas can have their own security fence. This can act as a physical code break between on-plot process and pipeline design codes.
Air enters the compressor of an ideal air standard Brayton cycle at 100kPa, 250C with a volumetric flow rate of 8m3/s and is compressed to 1000kPa. The temperature at the inlet to
Feces Collection: Small aliquots of feces are frequently analyzed to detect the presence of "hidden" blood, so called occult blood, which is recognized as one of the most ef
What is raft foundation? A raft or mat can be considered as a combined footing which covers the entire building area and supports all columns and walls. Such a foundation may c
Calculate the weight of body and the coefficient of friction: Q: Bodies resting on rough horizontal plane required pull of 24N inclined at 30º to the plane just to move it. I
Q. Define Heat for electrical resistance welding? The heat, H for electrical resistance welding is generated by passing a large electrical current ( of the order of 3000 to 100
Answers all questions i. Illustrate Zeroth law of thermodynamics. ii. A gas contained in a cylinder is compressed, the work neede for compression being 5000 KJ. During the pr
A circular thin steel diaphragm having an effective diameter of 20mm is clamped around its periphery and is subjected to a uniform gas pressure of 180kN/m^2. Calculate the minim
Combined Rules MOD (modified operation due date) PN j = max (t + o j , t dj ) (SPT-Tr) (Truncated SPT)
A horizontal line ABCD measuring 9m is acted upon by forces of magnitude 400, 600, 400 and 200 N at points A, B, C, D respectively with downward direction. These point are so locat
what is meant by tool signature
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd