Safe access and location of buildings in plant design, Mechanical Engineering

Assignment Help:

The following items should be considered regarding the safe access and location of buildings:

• The fire fighting pump house is usually located in a non-hazardous OSBL location.

• Main administration buildings and fire stations should be designed for blast resistance. They should be positioned close to the main entrance, away from hazardous areas, and upwind of process, utility and storage areas. Access to the administrative/support buildings should be direct from the property line and should not require traveling through process or storage areas.

• Control / amenities buildings shall be located in a safe area away from hazardous areas, upwind of hydrocarbon process units and storage tankage, and not alongside main routes to loading / unloading areas, with consideration to convenience for daily access and operation. Buildings can be located closer to the process plant but with an obvious cost penalty (additional cost of blast resistant building).

• Control Rooms serving unusually large hazardous units, central control houses for multiple units or control room housing computer equipment require greater spacing from fire or explosion hazards. They also require proper risk assessment as per API RP 752 ‘Management of Hazards Associated with Location of Process Plant Permanent Buildings'.


Related Discussions:- Safe access and location of buildings in plant design

Wet h2s corrosion, There is risk of wet H 2 S corrosion in all emulsion and...

There is risk of wet H 2 S corrosion in all emulsion and gas lines from the Inlet Separator up to and including the Treater. Full compliance to NACE is highly recommended to contro

Structures of materials, what is the difference between atomic structure an...

what is the difference between atomic structure and crystal structure

Illustrate the cad interface, CAD*I Interface The CAD*I interface was d...

CAD*I Interface The CAD*I interface was developed within the framework of the ESPRIT Project 322 of the European Commission. The project was started in 1985 and had duration of

Evaluation of heat required - thermodynamics, Evaluation of heat Required: ...

Evaluation of heat Required: Heat which is required to generate steam is different from 'total heat' or enthalpy of steam. Heat required for generating steam means heat needed

Points of contraflexure, Points of Contraflexure: Assume M 1 , M 2 , ....

Points of Contraflexure: Assume M 1 , M 2 , . . . and M 6 be the points of contraflexure, where bending moment changes sign. To determine the position of M 2 , let a section

Manufacturing , Differentiate between hot working and cold working process

Differentiate between hot working and cold working process

Explain introduction of radial drilling machine, Explain introduction of  ...

Explain introduction of  Radial Drilling Machine Machine Name: - Radial Drilling Machine Radial Drilling machine is a machine fitted with a rotating cutting tool known as dr

Locomotive boiler, LOCOMOTIVE BOILER: It is horizontal, natural cir...

LOCOMOTIVE BOILER: It is horizontal, natural circulation, fire tube boiler. It can generate steam at the rate of 7000 kg/hr. at pressure of up to 2.5 Mpa. Earlier it was us

Friction, What are the laws of sold friction

What are the laws of sold friction

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd