roof truss, Civil Engineering

Assignment Help:
The angle between the members at the

joint is 30°. Design the members at the joint. Design also the connection of the members at the joint. The length of the principal rafter between the panel joints is 2.5 m. design the anchor bolts assuming a pull of 8KN.

Related Discussions:- roof truss

Major compensation of using hdpe as compared with cast iron, Question N...

Question Now, mainly flap valves are ended of HDPE. What is the major compensation of using HDPE as compared with cast iron? Answer (i) It has no response with sewage

Chemical classification of stones, Chemical Classification On the basis...

Chemical Classification On the basis of their chemical composition engineers prefer to classify  rocks as: 1.    Silicious rocks 2.    Argillaceous rocks 3.    Calcare

Guiding considerations in planning, Guiding Considerations in Planning: ...

Guiding Considerations in Planning: The following factors have a bearing on planning water transport facilities : (a)        Availability adequate land to accommodate the

Compute the thermal stresses in steel, Compute the thermal stresses in stee...

Compute the thermal stresses in steel: Consider the compound bar shown in below figure consisting of a steel bolt of diameter 18 mm, surrounded through a copper tube of outer

Define marine growth - underwater inspection of bridge, Define Marine growt...

Define Marine growth - underwater inspection of bridge? Generally, in seawater marine growth takes place. Acid generated by the marine growth attacks concrete. This can lead to

How to do deflection calculations, How to do deflection calculations Ba...

How to do deflection calculations Basic values of span to effective depth ratios for spans upto 10m may be taken as 7, 20 and 26 for cantilever, simply supported and continuous

Defaults for precast concrete pipes made by spinning, Q. Defaults for preca...

Q. Defaults for precast concrete pipes made by spinning? Small diameter precast concrete pipes are generally manufactured by spinning method. The spinning method fundamentally

Determine the late start time for activity, For the project network shown, ...

For the project network shown, the late start time (day) for activity "Q" is most nearly: Solution:  List the paths leading to "Q" and calculate the duration for each.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd