Road drainage and maintenance, Civil Engineering

Assignment Help:

Road Drainage and Maintenance:

The life of a road depends upon how well and quickly the water is drained away from its various components. Similarly, regular and periodic inspection and maintenance of a road ensures that the facility lasts over a period it is designed for.

Objectives

After studying this unit, you should be able to :

  • understand the importance of drainage of roads,
  • know surface and subsurface drainage is achieved through side drains, intercepting drains, the subsurface pipe drains and cross-drainage structures, and
  • discuss the road maintenance, how the maintenance needs are assessed and how the maintenance of various types of roads is achieved.

 


Related Discussions:- Road drainage and maintenance

Mechanism of formation of soil plugs, Question What is main mechanism o...

Question What is main mechanism of formation of soil plugs in marine driven steel piles with reinforced concrete infill? Answer Throughout initial driving process, ope

Method to calculate the loss of prestress, Method to calculate the loss of ...

Method to calculate the loss of prestress When the consider creep in regard to loss of prestress, we have to see that the prestressed member is under compressive stresses due

Foundation, classification of foundation

classification of foundation

Washer – necessary for bolts, Q. Washer – necessary for bolts? 'Fastene...

Q. Washer – necessary for bolts? 'Fastener' is a general term which is used to describe something that is used as a restraint for holding things together or attaching them to o

Wearing course or additional thickness be designed on piers, Question S...

Question Shall layer of wearing course or additional thickness be designed on surface of piers ? Answer In designing of piers , considerations have to be given to

Penetration test, Penetration Test: A viscosity is measured indirectl...

Penetration Test: A viscosity is measured indirectly by the penetration of a standard needle under standard conditions of load, time and temperature. The test measures the ha

#titl, Two readings ie 1.64m and 0.73m were taken during leveling procedure...

Two readings ie 1.64m and 0.73m were taken during leveling procedure to define the slope of a centerline of a bridge at points A and B. If distance AB=50 m, find the slope of line

What is initial prestress, What is Initial Prestress From the transfer ...

What is Initial Prestress From the transfer stage, tensile stresses in tendons apply compressive stresses in concrete. The initial value of  these stresses (in tendons or in co

Aggregate value, how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd