The life of a road depends upon how well and quickly the water is drained away from its various components. Similarly, regular and periodic inspection and maintenance of a road ensures that the facility lasts over a period it is designed for.

Objectives

After studying this unit, you should be able to :

  • understand the importance of drainage of roads,
  • know surface and subsurface drainage is achieved through side drains, intercepting drains, the subsurface pipe drains and cross-drainage structures, and
  • discuss the road maintenance, how the maintenance needs are assessed and how the maintenance of various types of roads is achieved.

 


Related Discussions:- Road drainage and maintenance

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Passenger conveyors, Passenger Conveyors: Passenger conveyors are used...

Passenger Conveyors: Passenger conveyors are used at locations where a large concentration of passengers has to be moved from one place to another. Escalators are used to conv

Steel overlap in columns, where we can overlap steel in columns if we use ...

where we can overlap steel in columns if we use 50 or 60 bar diameter as overlap length.

How should reservoir floors be designed, Question In designing of servi...

Question In designing of service reservoirs, how should reservoir floors be designed to avoid leakage of water because of seasonal and shrinkage movements ? Answer I

Control reinforcement corrosion, Crack width limitation ( In many stand...

Crack width limitation ( In many standards and code of practice of numerous countries, allowable size of crack width is generally limited to less than 0.5mm for reinforced conc

Describe the behaviour of pre and post-tensioned members, Describe the beha...

Describe the behaviour of pre and post-tensioned members The behaviour of pre and post-tensioned members under imposed loads may be different, especially when the cracking patt

Remedial proposal to rectify situation, Question During deep excavatio...

Question During deep excavation , neighbouring ground water table is drawn down that might affect settlement of nearby buildings. What is remedial proposal to rectify situatio

Cross-section of exogenous tree, The cross-section of exogenous tree is as ...

The cross-section of exogenous tree is as shown in given figure.The following components are visible to the naked eye:           Cross-section of exogeneous tree 1. P

Explain the methods of underwater inspection, Explain the Methods of Underw...

Explain the Methods of Underwater Inspection? There are three common methods of carrying out underwater inspection of bridge elements. a)  Wading inspection b)  Scuba div

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd