Road drainage and maintenance, Civil Engineering

Assignment Help:

Road Drainage and Maintenance:

The life of a road depends upon how well and quickly the water is drained away from its various components. Similarly, regular and periodic inspection and maintenance of a road ensures that the facility lasts over a period it is designed for.

Objectives

After studying this unit, you should be able to :

  • understand the importance of drainage of roads,
  • know surface and subsurface drainage is achieved through side drains, intercepting drains, the subsurface pipe drains and cross-drainage structures, and
  • discuss the road maintenance, how the maintenance needs are assessed and how the maintenance of various types of roads is achieved.

 


Related Discussions:- Road drainage and maintenance

Crushing strength test - tests on stones, Crushing Strength Test: F...

Crushing Strength Test: For conducting this test, specimen of size 40 × 40 × 40 mm is build from parent stone. Then finely the sides are dressed and placed in water for thr

Show the silt curtain touching seabed, Q. Show the Silt curtain touching se...

Q. Show the Silt curtain touching seabed? Silt curtains are impermeable vertical barriers extending from seawater surface to their designed depths. Curtains are held in a verti

Similarity between post and pre tensioned concrete, Similarity between post...

Similarity between post and pre tensioned concrete In the case of  pre-tensioned concrete members, a pattern of  small length and  small width cracks which are more in numbers

Design the curtain to touch the seabed, Question For fixing of silt cur...

Question For fixing of silt curtains, what is the reason that it does not desirable to design the curtain to touch the seabed ? Answer Silt finished are resistant ve

Properties of elastomer, An elastomer is a polymeric substance obtained aft...

An elastomer is a polymeric substance obtained after vulcanization of rubber. Vulcanization is the process of improving the properties of rubber by heating with sulphur. A normal r

Determine the cubic yard in the ground, An earthwork contractor encountered...

An earthwork contractor encountered a location within the borrow area where the geological conditions changed.  Instead of encountering 100 cubic yards of wet clay, the contractor

Solid mensuration, the base of an isosceles triangle and the altitude is dr...

the base of an isosceles triangle and the altitude is drawn from one of the congruent sides are equal to 18cm and 15cm , respectively . Find the lenghts of the sides of the triangl

Los angeles abrasion test, Los Angeles Abrasion Test: In which the agg...

Los Angeles Abrasion Test: In which the aggregates are placed in a rotating drum in which a certain number of cast iron cylindrical balls are also placed, and the drum rotated

Earth Pressure Theories.., While calculating Active Earth Pressure, do Colo...

While calculating Active Earth Pressure, do Coloumb''s Theory and Rehbann''s theory yield same results? I''ve tried and didn''t get the same results. Where might be the mistake?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd