Road drainage and maintenance, Civil Engineering

Assignment Help:

Road Drainage and Maintenance:

The life of a road depends upon how well and quickly the water is drained away from its various components. Similarly, regular and periodic inspection and maintenance of a road ensures that the facility lasts over a period it is designed for.

Objectives

After studying this unit, you should be able to :

  • understand the importance of drainage of roads,
  • know surface and subsurface drainage is achieved through side drains, intercepting drains, the subsurface pipe drains and cross-drainage structures, and
  • discuss the road maintenance, how the maintenance needs are assessed and how the maintenance of various types of roads is achieved.

 


Related Discussions:- Road drainage and maintenance

What is a footing foundation for a water tower, A footing foundation for a ...

A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla

Construction measurment, calculating quantity of excavation, formwork, conc...

calculating quantity of excavation, formwork, concrete

Calculus, how can i get the centroids of the a given curve?. is there''s a ...

how can i get the centroids of the a given curve?. is there''s a formula for?

Calculate the degree of saturation, A sample of clay taken from a natural s...

A sample of clay taken from a natural stratum was originated to be partially saturated and when tested in the laboratory gave the following results. Calculate the degree of saturat

Determine the ruthann graphical method, A retaining wall with a vertical ba...

A retaining wall with a vertical back 5 m high supports cohesion less backfill of unit weight of 19 kN/m 3 . The upper surface of the backfill rises at an angle of 10° with the hor

Calculate the ultimate bearing capacity of the footing, A continuous footin...

A continuous footing of width 2.5 m rests 1.5 m below the ground surface in clay. The unconfined compressive strength of the clay is 150 kN/m 2 . Measure the ultimate bearing ca

Define well steoning, Q. Define Well Steoning? It is the side wall of w...

Q. Define Well Steoning? It is the side wall of well foundation. It is built of masonry or cement concrete not less than M 10 grade, sufficient bond rods should be provided to

Define the crash rate for intersection, An intersection has a total enterin...

An intersection has a total entering traffic volume of 42,000 vehicles per day.  During the past three years, there have been a total of 35 reported intersection-related crashes.

Highway engineering., history and development of indian road and planning

history and development of indian road and planning

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd