Question

While design life will it be same as return period for design situations?


Answer

Design life means least duration a structure is accepted to last. Longer is design life; so higher is cost of a project. So, while choosing design life for a structure, engineers have to consider design life that generates an economical project without sacrificing necessary function.

During selection of return period of convinced design conditions, winds, waves. One should think consequences of exceedance. In reality, there are usually no extreme maximum values of these plan conditions and its variety is based on probability of exceedance that is related to return time.

So, design life might not be like to return time of design conditions while their ranges are based on diverse considerations.

 


Related Discussions:- Return period for design situations

Plane tabling, difference between compass suveying and chain surveying

difference between compass suveying and chain surveying

Explain the contracted rectangular weir, Explain the Contracted Rectangular...

Explain the Contracted Rectangular Weir Weir plate has sides which extend above the maximum water surface, directing the flow through an opening (b = weir length). Typically th

Define influence lines, Define Influence lines Provides information...

Define Influence lines Provides information at a single point on a beam Can be used for: - Reactions - Internal shear forces - Internal moment Indicate

In marine pile type of steel tubular piles, Question In marine pile typ...

Question In marine pile type of steel tubular piles with reinforced concrete infill, least toe level is frequently specified in contract drawings. What is the purpose in your v

Warm mix asphalt., how it different from hot mix asphalt . is it changes an...

how it different from hot mix asphalt . is it changes any performance compared to hot mix asphalt

An alternative test to confirm concrete strength, Question If concrete comp...

Question If concrete compression test not pass, So Schmidt hammer test will be adopted as an alternative test to confirm concrete strength ? Answer Schmidt hammer test is

Depth of boring for multi-storeyed building, Depth of Boring  for Multi-st...

Depth of Boring  for Multi-storeyed Building Peck has recommended that first drill hole is to be made up to depth at which the presence of a thick layer of soft clay with a hig

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd