Retardation of fresh concrete, Civil Engineering

Assignment Help:

Retardation of fresh concrete has numerous benefits as below:

(i)  A rapid hydration process leads to loss in concrete strength since concrete will have a poorer structure with a higher gel/space ratio compared with concrete with a lower hydration rate. 

(ii) At the time of the hydration process, a substantial heat of hydration would be produced. If the hydration process is performed too swiftly, it will cause a rapid increase in temperature and leads in considerable early thermal movement in concrete.

(iii) In hot weather concreting, loss of workability is considerable. So as to ensure sufficient compaction of fresh concrete, it is essential to extend the time for fresh concrete to remain plastic.


Related Discussions:- Retardation of fresh concrete

Steel and timber structures, design a tension member subjected to a pull of...

design a tension member subjected to a pull of 300KN using a channel section. the length of a joint available is only 400mm.check the condition of using lug angle for end connecti

Riveted and welded joints, Riveted and Welded Joints: This theory deal...

Riveted and Welded Joints: This theory deals with riveted and welded connections. In riveted connections, you have learnt different types of rivet and various parameters perta

Explain horizontal circular curves - transportation, Explain Horizontal Cir...

Explain Horizontal Circular Curves - Transportation Horizontal circular curve is a circular arc between two straight lines known as tangents.

Define the fatigue failure - underwater inspection of bridge, Define the Fa...

Define the Fatigue failure - underwater inspection of bridge? Fatigue failure results in the fracture of structural members as a consequence of repeated high loading.  Fatigue

Choosing between trailer suction hopper and grab dredgers, Question In ...

Question In search reclamation, what are considerations in choosing between trailer suction hopper dredgers and grab dredgers ? Answer Trailer suction hopper dred

Aggregate value, how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

Pavement design, differences between highway pavement and airfield pavement...

differences between highway pavement and airfield pavement

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd