Q. Resource Management for project?

An important factor in overall project success is the provision of suitable and adequate resources. The initial estimate of engineering manhours and schedule provide the basis for the planned resource allocation (manpower) to a project.

Just as important as the original manpower plan is the subsequent monitoring of resources. Project changes in scope and schedule along with an ongoing evaluation of progress measurement can lead to deviation from the original plan and the need to re-assess manpower allocated to the project.

In consideration of the above, the Lead Mechanical Engineer will undertake periodic reviews (weekly, bi-weekly, etc., as identified in the Project Execution Plan) of engineering performance (manhours planned/ spent, progress) in order to determine if any corrective actions are required.


Related Discussions:- Resource management for project

Determine the origin of step, Determine the Origin of STEP Considerable...

Determine the Origin of STEP Considerable progress has been made in vector data exchange over the recent past. Initially, some CAD/CAM vendors offered direct translator softwar

Determine the width and depth of the beam, Determine the width and depth of...

Determine the width and depth of the beam: A timber beam of rectangular section is only supported over a span of 5 m. It carries an uniformly distributed load of 15 kN/m over

Carnot cycle, matlab programme for carnot cycle

matlab programme for carnot cycle

Flange assembly with bolt tensioning, Q. Flange Assembly with Bolt Tensioni...

Q. Flange Assembly with Bolt Tensioning? Measure the free length of the bolts ultrasonically. This must be done prior to applying any load to the bolt. Install bolts on the

Group technology, comparing the different coding systems ?

comparing the different coding systems ?

Soil conditions for plant layout, Q. Soil conditions for plant layout? ...

Q. Soil conditions for plant layout? Soil conditions affect the foundation requirements, drainage, type of substructure used and may limit the size and shape of the facility. T

Ratio of applied stress and yield stress, Ratio of applied stress and yield...

Ratio of applied stress and yield stress: What should be the ratio of applied stress, s, to yield stress s Y in a large thin plate so that plastic spread along lint of crack

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd