Relation of the angle of contact between pipe invert and bedding material to the load resisting capacity of pipe

Minimum crushing strength is a generally adopted parameter for describing the strength of rigid pipes such as concrete pipes. This value is determined in laboratory by subjecting the test concrete pipe to a line load diametrically along the pipe length whereas the pipe invert is supported on two bearers for stability reason. This test is known as three-edge bearing test and the load at failure of pipes is expressed in terms of kN per length of test pipes (known as minimum crushing strength).  

Bedding factor of a pipe is stated as failure load for the pipe laid in actual ground with bedding to the failure load under three-edge bearing test. Bedding factor is largely related to angle of contact between pipe invert and bedding material. Angle of contact between pipe invert and bedding material increases with the ratio of bending moment at invert (for the case of three-edge bearing test) to the angle under consideration.


Related Discussions:- Relation of the angle of contact between pipe invert

Define the process of eccentric prestressing, Define the proess of Eccentri...

Define the proess of Eccentric Prestressing In this form of prestressing, the centroid of cross-sectional areas of tendons is not located at the centroid of the cross-section.

Hill roads, functions of breast wall& scupper

functions of breast wall& scupper

What is the station at point b, What is the station at Point B? SO...

What is the station at Point B? SOLUTION 3 Station at Point A = Sta 22+45  Station at Point B = (Sta 22+45) + 1028' = 2245'+1028' =3273'  = Sta 32+73

Explain the rippl diagram or mass diagram, Explain the Rippl Diagram or Mas...

Explain the Rippl Diagram or Mass Diagram For a potable water reservoir, it is the simultaneous plots of the cumulative inflow and cumulative water consumption/demand, termed "

Concrete mixers, what do you mean by buttering mixers

what do you mean by buttering mixers

Explain the aashto classification system, Explain the AASHTO Classification...

Explain the AASHTO Classification System   1.  Identify the percent passing the No.10, No. 40, and No. 200 sieves. Identify the LL and PI of the fraction passing the No. 40 sie

Engineering Mechanics, the jet transport B is flying north with a velocity ...

the jet transport B is flying north with a velocity vB = 600 km/h when a smaller aircraft A passes underneath the transport headed in the 60 degree direction shown. To passengers i

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd