Reasons of ground heaving during pipe-jacking

It is commonly recognized that ground settlement is one of the significant concern in pipe jacking operation. Though engineer must also pay attention to the problem of ground heaving at the time of grouting work of pipe-jacking. For illustration, if excessive slurry or grout pressure is applied so as to exceed overburden pressure, ground heaving would result. Otherwise if the ground contains loose soils with high porosity, same phenomenon also takes place. Proper control on the applied pressure and viscosity of slurry/grout is essential to prevent such occurrence.


Related Discussions:- Reasons of ground heaving during pipe-jacking

Enumerate the term - failure due to crushing of concrete, Enumerate the ter...

Enumerate the term - Failure Due to Crushing of Concrete Over reinforced pre-stressed concrete members, provided with a large amount of pre-stressing steel or relatively small

Estimation specification and costing, Estimate the single room of size 3m x...

Estimate the single room of size 3m x 4m x height 3m using individual wall method?

Defaults for precast concrete pipes made by spinning, Q. Defaults for preca...

Q. Defaults for precast concrete pipes made by spinning? Small diameter precast concrete pipes are generally manufactured by spinning method. The spinning method fundamentally

Elastic curve, elastic curve of a simply supported beam with triangular loa...

elastic curve of a simply supported beam with triangular load

Fore bearing, find out the interior angleS with diagrame LINE AB, BC, CD, D...

find out the interior angleS with diagrame LINE AB, BC, CD, DE, EA Fore bearing 60''30" , 122'' , 46'' , 205''30" , 300''

Survey question, Sir morng..i know about WCB AND RB.With diagram..pls help ...

Sir morng..i know about WCB AND RB.With diagram..pls help me sir

Describe the behaviour of pre and post-tensioned members, Describe the beha...

Describe the behaviour of pre and post-tensioned members The behaviour of pre and post-tensioned members under imposed loads may be different, especially when the cracking patt

Discuss about the fibre reinforced concrete, Discuss about the fibre reinfo...

Discuss about the fibre reinforced concrete Tensile strength of concrete may be improved by using a higher grade of concrete or by using special concretes such as fibre reinfor

Factors affecting location decision, Factors Affecting Location Decision: ...

Factors Affecting Location Decision:   Mining, quarrying and heavy manufacturing have capital intensive facilities that are costly to build and cover large area and use large q

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd