Reasons for blockage in pumping concrete, Civil Engineering

Assignment Help:

Q. Reasons for blockage in pumping concrete ?

Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction works can be boosted up by using concrete pumping since a larger volume of pours can be achieved within a specified duration when compared with normal concrete placing methods.  

Blockage can take place at the time of pumping operation for the subsequent two common reasons:

(i)  For saturated concrete mixes, pump pressures can force water out of the concrete leading in bleeding. Flow resistance is then increased and can contribute to blockage of pipelines. 

(ii) If cement content (or other components of concrete mixes which increase frictional forces) is high, a higher frictional resistance to pumping can develop and concrete can't be pump able.


Related Discussions:- Reasons for blockage in pumping concrete

Explain the dry density and buoyant unit weight, A partially saturated soil...

A partially saturated soil from an earth fill has a natural water content of 19% and a bulk unit weight of 19.33 kN/m 3 . Suppose the specific gravity of soil solids as 2.7, comput

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Determine the statements about unit area or borrow pit, Determine the State...

Determine the Statements about Unit Area or Borrow Pit? Ans: I.  Sometimes called Average Depth II. Works well for volumes for building sites and surface mines III. Needs

Foundation, classification of foundation

classification of foundation

Concrete technology, material for formwork and their specifications

material for formwork and their specifications

#title Design a gravity-flow sanitary sewer , i have to Design a gravity-f...

i have to Design a gravity-flow sanitary sewer to serve and i need it to be done asap

Important items during level crossing inspection, Q.7.- Write the important...

Q.7.- Write the important items to be inspected during level Crossing inspection. How do you take census of traffic at level crossing. Ans.-Important items to be inspected duri

Determine about the pre-stressed concrete beam, Determine about the pre-str...

Determine about the pre-stressed concrete beam A pre-stressed concrete beam has a width of 200 mm and an overall depth of 400 mm. The permissible stresses in tension and compre

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd