Q. Reasons for blockage in pumping concrete ?
Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction works can be boosted up by using concrete pumping since a larger volume of pours can be achieved within a specified duration when compared with normal concrete placing methods.
Blockage can take place at the time of pumping operation for the subsequent two common reasons:
(i) For saturated concrete mixes, pump pressures can force water out of the concrete leading in bleeding. Flow resistance is then increased and can contribute to blockage of pipelines.
(ii) If cement content (or other components of concrete mixes which increase frictional forces) is high, a higher frictional resistance to pumping can develop and concrete can't be pump able.
Q. How to set Location of the bridge? A bridge is normally located where the river section has minimum width so that the structure becomes shorter and economical. As far as pos
sir i want to know that which pages of IS800:2007 is used for steel design of tension member, compression member, collumn, beam, connections, trusses etc.. please give me the topic
The internal forces in any cross-section of a symmetric member in pure bending are equivalent toa couple M The moment of the couple is referred to as the bending moment in the s
Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo
concrete strength
Q. What is Long Welded Rail? Long Welded Rail is a welded rail the central part of which dose not under go any longitudinal movement due to temperature variation, normally a le
Q. Show the Limitations of grillage analysis? In designing the number of cells for concrete box girder bridges, in case depth of a box girder bridge exceeds 1/6 or 1/5 of bridg
Resultant force at a section We can determine stresses at top and bottom fibres, at a section of a beam, due to pre-stressing force and external loads. Using them, we can draw
Describe why soils are compacted in the field. How is the degree of compaction ensured in the field (i.e., control of field compaction)? Distinguish among 'compaction' and 'consoli
The loading period for a building extended from Feb., 1957 to Feb., 1959. In Feb., 1962, the average measured settlement was found to be 117 mm. The ultimate settlement was expecte
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd