Raking piles of bridge abutment placed under an embankment, Civil Engineering

Assignment Help:

Question
It should be necessary that raking piles of a bridge abutment be placed under an embankment?

Answer
For a bridge abutment to be supported on raking piles with diverse orientations, movement between ground and pile group is difficult to guess. For instance, if some of raking piles of bridge abutment are extended beneath an embankment, then settlement of embankment behind abutment may cause raking piles to experience severe flexible moment and break piles as recommended by Dr. Edmund C Hambly in 1979.


Related Discussions:- Raking piles of bridge abutment placed under an embankment

Engineering mechanics, Characteristics of couple #Minimum 150 words accepte...

Characteristics of couple #Minimum 150 words accepted#

Define the statements about error analysis, Define the statements about err...

Define the statements about error analysis? I.  The expected value (or: most likely; probable value) of a measurement is the value that has the highest value of being correct.

Standard mixes of concrete, In some nations such as Britain, specification ...

In some nations such as Britain, specification for concrete doesn'tusually require cube tests for standard mixes of concrete. Quality control of standard mixes in Britain is achiev

Test for determination of uitimate compressive strength, Q. Test for determ...

Q. Test for determination of Ultimate Compressive Strength The test pieces are to be loaded either till the failure of the steel laiminate or till the irreversible squeezing ou

The right triangle, a lighthouse standing on the cliff observed from two op...

a lighthouse standing on the cliff observed from two open boats A and B in a vertical plane thourgh the lighthouse.the angle of elevation of the top of the lighthouse viewed from B

Geology, http://www.expertsmind.com/engineering-homework-assignment-help.as...

http://www.expertsmind.com/engineering-homework-assignment-help.aspx

Foundation, Explain briefly shallow foundation?

Explain briefly shallow foundation?

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd