Quantitative, finance, Other Engineering

Assignment Help:
Case 1: Decision Analysis
Flifla sells tomatoes every day in Suk al Marqazi, the downtown fruit and vegetable market. He finds that he can order tomatoes in crates of 25 kg and he is able to stock a maximum of four crates or 100 kg of tomatoes. His experience taught him that the daily demand ranges from 0 to100 kg of tomatoes. Flifla sells tomatoes at 1 dirham/kg. His cost is Dhs 0.70 per kg. Therefore, his profit is Dhs 0.30 per kg of tomatoes sold. For any unsold tomatoes, Flifla can sell them for Dhs 0.50 to a recycling firm that produces tomato paste. Flifla’s objective is to determine the quantity of tomatoes to buy each day to maximize his profits. Answer the following questions.
• Construct a conditional payoff table.
• What is the best decision according to the following criteria?
• Optimistic criterion
• Pessimistic criterion
• Equally likely
• Construct an opportunity loss table.
• What is the Minimax regret?
• Assume the following probability distribution:
Demand: 0 kg, 25 kg, 50 kg, 75 kg, 100 kg.
Probability: 0.05,0.10,0.30,0.35,0.20
What is the best decision according to the Expected Monetary Value?
• What is the best decision according to the Expected Opportunity Loss?
• What is the Expected Value of Perfect Information?

Related Discussions:- Quantitative, finance

Telecom engg, the project those see in the matlab project which in the voic...

the project those see in the matlab project which in the voice of different birds

Signal conditioning amplifier, Signal conditioning amplifier The primar...

Signal conditioning amplifier The primary function of the signal conditioning amplifier is to match the output signal range of the transducer to the input signal range of the a

Engineering machnics, a part of machine has a reciprocating motion which is...

a part of machine has a reciprocating motion which is simple harmonic making 200 complete oscillations in a minute.the part weight 45 N.determine the accelerating force upon it

Tube drawing, Drawing operation can also be used for reducing the tube cros...

Drawing operation can also be used for reducing the tube cross-section. The drawing equipment consists of draw bench and die. One end of the tube is pulled through the die over a f

Y 4 u, Ask questioy 4 men #Minimum 100 words accepted#

Ask questioy 4 men #Minimum 100 words accepted#

Present worth equivalence in economical engineering, Present Worth equivale...

Present Worth equivalence: Since we have developed the relationship to find a future value F given a present value P, we can easily derive the formula to find a (P|F, i, n), w

Highway maintenance, Various types of Bituminous Course? Explain each

Various types of Bituminous Course? Explain each

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd