Quality of supply and services - power distribution, Electrical Engineering

Assignment Help:

Quality of Supply and Services  - Power Distribution

For effectual management and performance improvement it is essential to measure the several defined parameters of the process. Key Performance Indicator (KPI) gives the different parameters along with the measuring process. Once the things are measured, then they required to be presented effectively so that useful information can be derived from the raw data of KPI.

Operations Management is commonly concerned along with the efficient conversion of all resources into products or services for meeting the customer's needs. This subject has its root in the school of scientific management that sometime termed as "Efficiency Oriented Management". Therefore, during the last three decades, it has started analysing a problem from holistic or systems approach through integrating supplier, producer and customers. This viewpoint has resulted in the evolution of new paradigm known as customer satisfaction and delightment. The philosophy of Total Quality Management (TQM) has enabled to achieve this delighment. The prefixing of the world 'TOTAL' in Quality Management has introduced a sea change in the approach. TQM uses a variety of tools for attaining its objectives of that seven quality control tools are simplest to apply in any environment.


Related Discussions:- Quality of supply and services - power distribution

Compute the load power factor, Considering Figure, let balanced positive-se...

Considering Figure, let balanced positive-sequence, three-phase voltages with ¯V AB = 100√3 0° V (rms) be applied to terminals A, B, and C. The three-phase wye-connected balanced

What is the use of latch signal on the ad0-ad15 bus, What is the  use of l...

What is the  use of latch signal on the AD0-AD15 bus in an 8086 system? Latch signal is used to load the data those are fetched from memory to bus.

Clampers.., plz give ans about signs of capicitor, and give detail about cl...

plz give ans about signs of capicitor, and give detail about clampers.

Show how emitter amplifier work as a buffer amplifier, Q. Due to what speci...

Q. Due to what special property does an emitter amplifier work as a buffer amplifier?  The circuit design of the emitter follower is such that it has a high input impedance and

What are magnetic materials, Magnetic materials (A) provide path to ma...

Magnetic materials (A) provide path to magnetic flux. (B) are good insulators. (C) are semiconductors. (D) None. Ans: Magnetic materials provide path to

Determine the flux, Q. Consider themagnetic circuit of Figure. Let the cros...

Q. Consider themagnetic circuit of Figure. Let the cross-sectional area AC of the core, be 16 cm 2 , the average length of the magnetic path in the core lC be 40 cm, the number

Application platform requirement - gis technology, Software/Application Pla...

Software/Application Platform Requirement: GIS solutions would primarily consist of Database and Applications software. The application package should work in LAN/WAN/Interne

Pu value, the p.u. reactance of a 25 MVA, 13.2 kV alternator 0.5 p.u. On a ...

the p.u. reactance of a 25 MVA, 13.2 kV alternator 0.5 p.u. On a base of 50 MVA and 13.8 KV the p.u. value shall be

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd