Quality control of concrete roads, Civil Engineering

Assignment Help:

Quality Control of Concrete Roads:

Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly:

(a) Strength, shape and gradation of aggregates

(b) Quality of cement

(c) Slump of mix

(d) Strength of concrete

(e) Density and thickness of pavement

(f) Alignment, grade and profile of concrete pavement


Related Discussions:- Quality control of concrete roads

Fly levelling, what is fly levelling? when it is carried out ?

what is fly levelling? when it is carried out ?

Calculate the parameters for setting out curve, Q For a curve of 50, apex ...

Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p

Ropeways, Ropeways: The system of ropeways consists of : (a) a cabl...

Ropeways: The system of ropeways consists of : (a) a cable suspended between towers, and (b) cars which move on the cable. Case with capacity upto 20 passengers is us

Lock entrance - docks, Lock Entrance: Wet docks have lock entrances to...

Lock Entrance: Wet docks have lock entrances to overcome the high fluctuations in water level in the sea. Figure 7 gives a layout of a lock entrance. It consists of a lock cha

Moisture content, What is moisture content for road work

What is moisture content for road work

Define water jets for underwater inspection of bridge, Define Water jets fo...

Define Water jets for underwater inspection of bridge? These tools are widely used and produce a bright metal finish in one operation. Grit entrainment is available and makes t

Define recommendations for design of ptfe sliding bearing, Define Recommend...

Define Recommendations for Design of PTFE Sliding Bearing? Other Recommendations for Design of PTFE Sliding Bearing 1. Expansion bearings having sliding surfaces of PTFE sha

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

Afflux in rivers with non scourable bed, Q. Afflux in rivers with non scour...

Q. Afflux in rivers with non scourable bed? Afflux is defined as rise of flood level of the river upstream of a bridge as a result of the obstruction to natural flow caused by

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd