Quality control of concrete roads, Civil Engineering

Assignment Help:

Quality Control of Concrete Roads:

Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly:

(a) Strength, shape and gradation of aggregates

(b) Quality of cement

(c) Slump of mix

(d) Strength of concrete

(e) Density and thickness of pavement

(f) Alignment, grade and profile of concrete pavement


Related Discussions:- Quality control of concrete roads

Ranging, describe reciprocal ranging

describe reciprocal ranging

Main principle of post-grouting for mini-piles, Question What is main p...

Question What is main principle of post-grouting for mini-piles? Answer During course of post-grouting , a tube with a hole at its base is lowered into pile and g

Surface dressing - road pavements, Surface Dressing: Surface dressing...

Surface Dressing: Surface dressing is an application of a thin film of bituminous binder followed by a coat of aggregates of single size, rolled into position. Surface dressi

Define hand tools for underwater inspection of bridge, Define Hand Tools fo...

Define Hand Tools for Underwater Inspection of Bridge? Hand tools involve scrapers, wire brushes, chain and wire ropes. Tools of this kind are suited in which cleaning is confi

Define special considerations for underwater inspection, Define Special con...

Define Special considerations for underwater inspection? Once a diver enters the water, there environment changes completely. Visibility decreases and is often reduced to near

What do you mean by M.A.S. accounts, Q. What do you mean by M A S Accounts?...

Q. What do you mean by M A S Accounts? This stands for material at site account. This is a suspense head of account that is maintained to watch actual consumption of materials

Afflux on account of obstruction to flow, Q. Afflux on account of obstructi...

Q. Afflux on account of obstruction to flow? Even if the river constriction on account of approach banks is not excessive and bridge waterway is wider than that causing critica

Ground water, Two pumping wells 1,000 m away fully penetrate the same confi...

Two pumping wells 1,000 m away fully penetrate the same confined aquifer. One of the wells pumps at a rate of 1,240 m3/day. The second well pumps at 850 m3/day. If the aquifer has

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd