Quality Control of Concrete Roads:
Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly:
(a) Strength, shape and gradation of aggregates
(b) Quality of cement
(c) Slump of mix
(d) Strength of concrete
(e) Density and thickness of pavement
(f) Alignment, grade and profile of concrete pavement
Determine the Head Loss Due To Friction Determine the head loss due to friction using the Darcy-Weisbach equation. The water is pumped at 3.0 gallons per minute, has a temperat
Example for Beam Flexure Design Select the lightest W section for the simply supported beam shown below. The beam length is 12ft. The nominal loading is: w d = 4.0 kip/ft (i
Explain Chlorine Residuals Free Chlorine Residuals: Cl 2 , HOCl, OCl- Combined Chlorine Residuals: Chloramines (mono, di and tri chloramines) The disinfecting ability o
Explain the Kinematic Viscosity Ratio of a fluid's Viscosity to the same fluid's Density. Greek symbol: ν nu ν = μ/ρ = Absolute Viscosity/Mass Density Units: ft
Question Is it true that stainless steel really stainless in construction purpose ? Answer Stainless steel refers to alloy steels with more than 10.5 percent of chrom
Question What are major differences between sureties and security ? Answer During construction contracts, if a contractor fails to carry out works, employer would e
Drainage of Embankment Slopes: Slopes of high embankments get eroded by rain water. Deep rain cuts are formed, which endanger the pavement. In such cases, it is customary to
The stresses acting on the plane of maximum shearing stress by a given point in sand are as follows: total normal stress = 250 kN/m 2 ; pore-water pressure = 88.5 kN/ m 2 ; shearin
Define the pre-tensioned concrete construction We understand that in the pre-tensioned concrete construction, stretched tendons are provided in the concrete moulds at the time
Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd