Quality control of concrete roads, Civil Engineering

Assignment Help:

Quality Control of Concrete Roads:

Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly:

(a) Strength, shape and gradation of aggregates

(b) Quality of cement

(c) Slump of mix

(d) Strength of concrete

(e) Density and thickness of pavement

(f) Alignment, grade and profile of concrete pavement


Related Discussions:- Quality control of concrete roads

Explain the influence line-moment, Influence line-moment 1.  Replace th...

Influence line-moment 1.  Replace the point of interest with an imaginary hinge. 2.  Rotate the beam one unit rotation by apply equal but opposite moments to each of the two

Basic keywords related to road materials, Basic Keywords related to road ma...

Basic Keywords related to road materials: Sub-grade     :            The portion of road embankment immediately below the pavement. Soil Classifications :            A sy

Need Answer, EXPLAIN THE STRUCTURE OF EXOGENEOUS TREE WITH DIAGRAM ?

EXPLAIN THE STRUCTURE OF EXOGENEOUS TREE WITH DIAGRAM ?

Illustrate concept of filter design, Q. Illustrate Concept of filter design...

Q. Illustrate Concept of filter design? The material used for filter should satisfy the following normal criteria a. Filter material is more pervious than the base material

Define bank volume to be stockpiled and used for backfill, An earthwork con...

An earthwork contract was awarded to excavate and backfill the foundation of a proposed 50-ft by 50-ft office building.  The existing grade elevation is 437.5-ft while the sub-base

What is the absolute pressure scale, Absolute pressure is measured from a v...

Absolute pressure is measured from a vacuum (0 PSI) and atmospheric pressure is14.7PSIa or 14.7 PSI above a vacuum 1PSI on a tire pressure gauge is known as 1PSIg = 15.7PSIa 10PSIg

Levelling, Permanent adjustment and temporary adjustment

Permanent adjustment and temporary adjustment

Working from whole to part, explain the principle of working from whole to ...

explain the principle of working from whole to part, as used in surveying

. determine the permeability of the aquifer, An unconfined aquifer is calle...

An unconfined aquifer is called to be 32 m thick below the water table. A constant discharge of 2 cubic metres per minute is pumped out of the aquifer by a tubewell till the water

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd