Purposes of subdivision of tunnelling faces in Sprayed Concrete Linings (SCL) method

In using sprayed concrete lining methods for lining a large tunnel in soft ground, tunnelling face is generally divided into many parts owing to the following reasons:

(i)  It allows early closure of part of the invert of the tunnel.

(ii) With the excavation in every part occurring at different times, it helps to decrease the area of exposure of the tunnel face so that there is better control on tunnel stability.

(iii)For unit advancement in any part of the tunnel excavation, amount of excavation and sprayed concrete is decreased. Hence this allows for early provision of primary support.


Related Discussions:- Purposes of subdivision of tunnelling faces

Tools of measerments, where i can get the tools of different types of mease...

where i can get the tools of different types of measerments of differents elements of construction?

Online job, I am M tech in civil engg looking for online assignment job.

I am M tech in civil engg looking for online assignment job.

Determine the shearing resistance of sand, In a drained triaxial compressio...

In a drained triaxial compression test, a saturated specimen of cohesionless sand fails at a deviator stress of 450 kN/m 2 when the cell pressure was 135 kN/m 2 . Search the ef

State the ground water levels, Ground Water Levels The location of the...

Ground Water Levels The location of the ground water level is essential for deep excavation, water-logged areas. The existing wells in the nearby vicinity of the proposed site

Determine the soil shrinkage, Soil at a borrow area has a total unit weight...

Soil at a borrow area has a total unit weight of 120-PCF and a water content of 15 percent.  The soil from the borrow area will be used as structural fill and compacted to an avera

Illustrate concept of filter design, Q. Illustrate Concept of filter design...

Q. Illustrate Concept of filter design? The material used for filter should satisfy the following normal criteria a. Filter material is more pervious than the base material

Design concrete structures and foundatri, What you need to do in my assignm...

What you need to do in my assignment only for the calculation part for project Task CalculateSG A: Ground Level, SG B: First Level, SG C: Second > Level, SG D: Third Level, and Su

Determining the amount of pre-camber, 1. Domes - You are a construction man...

1. Domes - You are a construction manager in the UAE in charge of a project that involves constructing domes.  Discuss briefly, giving examples, a range of different types of dome

Determine the viscosity of water, A soil sample consists of particles rangi...

A soil sample consists of particles ranging in size from 0.6 mm to 0.02 mm. The average exact gravity of the particles is 2.66. Verify the time of settlement of the coarsest and fi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd