Providing fire resistant:

If the building does not provide everyone with alternative exit routes then it may be acceptable for people to pass the fire if they are separated from the fire by fire resisting construction.

It is common for buildings to be designed in a way that does not provide everyone in the building with an alternative exit to which they can turn.  Any multi-storey building that only has a single staircase is bound to have people on each storey who have no choice but to use the staircase to escape. They are, in effect, up a vertical dead-end.

This is why staircases are enclosed in fire resisting construction with self-closing fire doors between them and the rooms.  With the staircase effectively enclosed so that it remains unaffected by fire or smoke for an extended period (typically 30 minutes) people will be able to easily pass down a staircase whilst a fire is in a room on the other side of the fire resisting construction and fire door.

When a protected escape route is created by enclosing it in fire resisting construction it is  important  that  the escape route does not  contain  anything  that  may catch  fire because if it did and those items did catch fire then people may not be able to pass the fire to get to safety.

 

 


Related Discussions:- Providing fire resistant - fire safety management

Retaining wall design, #questionYour search - design a trapezoidal retainin...

#questionYour search - design a trapezoidal retaining wall(assume dimensions) ,bulk density 15kN per metre cube ,coefficient of friction of 0.7,angle of internal friction 15degres

Npn and pnp, different operating modes of npn transistor

different operating modes of npn transistor

Dam engineering, How do we classify the principal planes as minor and major...

How do we classify the principal planes as minor and major principal planes?

Electrical engineering (power system analysis), I have a project in power f...

I have a project in power flow analysis. The project topic is: Study of Load impact on power flow (constant power, constant impedance, constant current, induction motor) and use th

Trade-offs in communications designs, Trade-offs in Communications Designs ...

Trade-offs in Communications Designs Satellite and Deep Space Communications               - Power is expensive to generate in space and transmission distances are eno

Second order decoupling approximation, The second order (two degree of free...

The second order (two degree of freedom) Dutch-Roll approximation is an approximation to the above fourth order system for the Dutch Roll dynamics. A justification for this is to c

What is ebidta?, What Is EBIDTA?  EBITDA appears for income before atten...

What Is EBIDTA?  EBITDA appears for income before attention, taxation, devaluation, and amount. EBITDA came into large use among personal investment companies, seeking to determ

Means of escape from trains - railway inspections, Means of escape from tra...

Means of escape from trains - railway inspections: The means of  escape from  trains is also considered  in  NFPA130.     Some  of  the considerations are: At least two eme

Interest rate calculations, Interest Rate Calculations In considering ...

Interest Rate Calculations In considering the time value of money, it is convenient to represent mathematically the relationship between the current or present value of a sing

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd