Projection welding, Mechanical Engineering

Assignment Help:

Projection Welding

 

This is a modified method of making single or multiple spot welds. Projection welds are made by providing an embossment or projection on one or both of the contacting base metal surfaces to localise the pressure and current flow at a particular point. The process is employed for fabrication of automobile components, wheels, etc.

 


Related Discussions:- Projection welding

Boiler classification, BOILER CLASSIFICATION : (1 )  According to Tub...

BOILER CLASSIFICATION : (1 )  According to Tube Contents:   Boilers can be water tube or fire tube type. In water tube boilers water flows in tubes and in Fire Tube Boilers h

Formed heads of vessels, Q. Formed heads of vessels? Formed heads are g...

Q. Formed heads of vessels? Formed heads are generally of 2:1 semi ellipsoidal form, but other heads may be used, such as hemispherical, torispherical, conical and toriconical.

Free body diagram-friction circle-inertia force , Free Body Diagram: whil...

Free Body Diagram: while a body or link is isolated, the forces (active and reactive) are also illustrated on it. It is called free body diagram of the body. The essential condit

Categorization of geometric models, Q. Categorization of Geometric models? ...

Q. Categorization of Geometric models? Modern CAD systems define objects in 3-D. Thus, the designer can construct 3-D model of objects conveniently and store the database of th

CAMS, COMPARISON WITH CAM MECHANISMS WITH LINKAGES

COMPARISON WITH CAM MECHANISMS WITH LINKAGES

What is metal jacketing, Q. What is Metal Jacketing? a) Metal jacketing...

Q. What is Metal Jacketing? a) Metal jacketing shall be Alcan T-3000-H14 series, T-1100-H14 or approved equivalent stucco embossed aluminum with a factory applied moisture barr

Heat balance sheet for an i.c engine, (a) Briefly explain the following per...

(a) Briefly explain the following performance parameters of I.C. engine : (i) Indicated men effective pressure (Pim) (ii) Brake power (BP) (iii) Indicated power (IP) (

What is a quari static process, Illustrate the terms : (i) State (ii)...

Illustrate the terms : (i) State (ii) Process and (iii) Cycle What is a quari static process ? Illustrate with an example. What are point function and path function.

Find out the effort required to run this machine, Find out the effort requi...

Find out the effort required to run this machine: The efficiency of a machine is 75% while an effort of 20 N is required to lift a load of 160 N. Compute the velocity ratio an

Explain function phase of hydrostatic sensor paver machine, Explain Functio...

Explain Function Phase of Hydrostatic sensor paver machine To identify the functions. To identify the functions regarding to the problem in paver machine. Our project focu

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd