Project contracts, Project Management

Assignment Help:

Understanding Project Contracts 

Project contracts invariably involve construction and therefore we will discuss contracts necessarily involving construction in this section. In addition to construction, other areas of work like design, engineering and procurement are involved in project contracts, but all these up front areas of work have to be followed by construction and subsequent commissioning of the project. In this section we will discuss about contracts combining some or all of these areas. 

A construction contract between Principal and Contractor can be formed by: 

  •   Negotiation. 
  •   Competitive tendering. 
  •   Combination of both. 

Mode 1  contract is formed by direct negotiation by the principal with one contractor. This mode is adopted only when work is very urgent, or when the principal believes that only one contractor is capable of building the project, or when the principal believes that time and money spent on tendering is wasteful. This  is practically non existent in government contracts, but can occur, although rarely, in private industry.  

Mode 2 competitive tendering is inviting for bids from several contractor to extract the best performance from the contractors. Competitive tendering exists invariably in public contracting. 

Mode 3  is an approach to negotiate with two or three bidders for securing the best possible price. When this is a post-bid negotiation, there is a danger that the lowest price bid agreed in the contract may not be realised on account of the contractor as he may have been coerced to accept a low price for getting the contract. The danger is that the cost risk gets transferred either to the principal through claims under the contract or to subcontractors.

Whatever be the mode of contracting adopted, we will now discuss contracts from the viewpoint of the scope of design and construction. When the two areas of work that is, design and construction is involved in a project, a third dimension of work viz. coordination necessarily arises. This combination means that the project manager must thoroughly understand the contracting strategies that can be adopted to ensure the ultimate achievement of the project deliverables. 

There are two broad methodologies in this section viz D-B-B (Design, Bid, Build) and D-B (Design and Build).  


Related Discussions:- Project contracts

Inventory and stores control, 1. Inventory  and Stores Control : Inventor...

1. Inventory  and Stores Control : Inventory  control is  a systematic procedure  for  ensuring  the  availability  of items necessary to meet the  production  requirements  at o

Flexible manufacturing system, Flexible Manufacturing System FMS (Flex...

Flexible Manufacturing System FMS (Flexible manufacturing system) is a computer controlled system. It consists of several stations each geared to different operations. Work st

Motivation fectore at work, ye project topic kis web site pr hai jise downl...

ye project topic kis web site pr hai jise downlode kar sake

Product development cycle, The product development cycle starts with th...

The product development cycle starts with the assessment of the customers needs and ends when the design is finally released for bulk production. The main steps in th

Operating cycle , using the operating cycle and any other financial managem...

using the operating cycle and any other financial management knowledge,discuss the applicabilty of such cycle to poultry

Kilbridge and wester method of line balancing, Kilbridge and Wester Method ...

Kilbridge and Wester Method of line Balancing Kilbridge and Wester propose this method. Here numbers are assigned to each operations describing how many predecessors it has.

Perform a status assessment of the project iteration, Perform a status asse...

Perform a status assessment of the first project iteration (IIP1). DO NOT GENERALISE. Assess each activity separately and specifically against the intended outcome stated in the it

Caselet, what are the objective of the project alignment session program?

what are the objective of the project alignment session program?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd