PRODUCTION PLANNING & CONTROL
Assignment 2



Kid style, International, makes furniture designed for children. Its most popular items are large and small toy boxes. Demand for toy boxes has over loaded its MPS, and the company does not know how it will meet demand.

1. Given the following BOM, MPS, and Inventory Master File, generate MRP
matrices for each item and identify orders that are past due.




Product Structure for Large and Small Boxes

Large toy box





Large housing Hardware Decals




Small toy box





Small housing Hardware Decals




Master Production Schedule

Item 1 2 3 4 5 6 7 8
Large toy box 30 60 30
Small toy box 25 45 60 30

Item Master File

Item On
Hand LT Lot Size
(multiples) Scheduled Receipt
Period Quantity Unit
Value $
Large toy box 30 2 50 - - 50.00


Small toy box 25 2 1 - - 30.00
Large housing 35 2 100 - - 15.00
Small housing 45 2 75 - - 10.00
Hardware 55 2 40 2 40 5.00
Decals 50 2 1 2 50 5.00

Kid style’s Scheduling Notes and Policies

1. Monthly sales forecast should be met within plus or minus 10%.
2. Delay of a customer’s order costs 10% of the value of the order per week.
3. Customer order may be delayed a maximum of two weeks.
4. It is possible to halve lead time, but the cost of producing or ordering the item increases by 50% (e.g. workers get paid time and a half for overtime)



Pegging Report

Requirements
Item Period Quantity Type Reference
Small toy box 1 25 MS-CO B070002
3 45 MS-CO B070002
4 30 MS-CO B064444
4 30 MS-FO Z842009
6 30 MS-FO
Large toy box 2 30 MS-CO A080100
4 30 MS-CO B064444
4 30 MS-FO Z900620
6 30 MS-FO

Related Discussions:- PRODUCTION PLANNING & CONTROL

Explain heat transfer with example, Define the difference modes of Heat Tra...

Define the difference modes of Heat Transfer with examples. State one system where Heat Transfer takes place because of all modes of Heat Transfer.

calculate the maximum power , The transmission output shaft for a heavy go...

The transmission output shaft for a heavy goods vehicle can withstand a safe working shear stress of 54MPa. Its outside diameter is 54mm and its internal diameter is 48mm. Calculat

Thermodynamics, What are significnces of quasi static process

What are significnces of quasi static process

Determine the largest value of force, Do not round intermediate calculation...

Do not round intermediate calculations; however for display purposes report intermediate steps rounded to four significant figures. Give your final answer(s) to three significant f

Level of safety organization, Level of Safety Organization This level ...

Level of Safety Organization This level comprises representatives of safety departments working at shop floor level or along with workers. The personnel will in fact implement

Explain co-planar parallel force, Illustrate following key terms with suita...

Illustrate following key terms with suitable example :- (a) Co-planar parallel force. (b) Co-planar non concurrent force. (c) Non co-planar concurrent force.

Find out the motion of the system, Find out the motion of the system: ...

Find out the motion of the system: Block (A) of mass M A = 40 kg is resting on coarse table having coefficient of friction = 0.1. This is tied up with an inextensible rope (

What is blow molding, Q. What is Blow molding ? Blow molding has been u...

Q. What is Blow molding ? Blow molding has been used for making plastic bottles, toys, doll bodies and many other items. The blow molding commences with the extrusion of the t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd