Q. Process of Steam generation unit?
BFW from water treatment area is sent to the BFW Booster pumps at temperature around 105°C. The BFW is then heated and fed to the HP BFW Pumps.
Chelant and oxygen scavenger are added to inhibit scale formation and remove DO in the BFW, respectively.
The high pressure BFW is boiled in the Steam Generators to generate 80% to 100% quality steam. Wet HP steam (for steam quality less than 100%) is sent to the HP Steam Separator to remove liquid and 100% quality steam is fed to the HP steam pipelines for injection at the well pads.
Liquid blowdown from HP Steam Separator is throttled down to lower pressure and sent to the MP Steam Separator for vapour-liquid separation.
Neutralizing amine is injected into the steam condensation system to prevent corrosion. The blowdown is cooled down and fed to the Evaporator Feed Tank.
assessment 9 questions
A Spring - mass system which is subjected to a harmonic force FCoswt. calculate the response of the system, refer figure Given x (0) = 0.01 m x(0) = 0.04 m/sec w = 30 rad/
Machine and Tool Selection The quality of a product largely depends on the type of machine, the type of process, machining conditions and the right selection of tools. The cur
what is equivalent evaporation
Steam engines: Steam engine is heat engine which converts heat energy to mechanical energy. The pressure energy of steam acts on piston and piston is moved to and fro in a cyl
write notes on internal treatement of water
ACSR (Aluminium Conductor Steel Reinforced) are used as (A) over head transmission lines. (B) super conductors. (C) fuse (D) underground cables.
What is an open pair?
Aeronautical engineering is a branch of aerospace engineering, thus some people use the 2 terms interchangeably. It is also sometimes considered that aeronautical engineering cover
Service duty point: 3 m3/h Backwash duty point: 9 m3/h Part (a) What is the speed of the pump to achieve the service and backwash flow rates ? Part (b) What would be the best
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd