Q. Process of Alloy Materials Sampling?

The following alloy-materials require a minimum of 10% per lot representative PMI sampling. If any incorrect material is found in representative sample basis testing, 100% PMI verification shall be required.

• Tubular products used in the fabrication of equipment, such as heat exchangers and boilers, provided that traceable mill certification is available.

• Fired heater, heat exchanger, and boiler internals example: tube hangers, tube supports, and tube-sheets. Internals which are part of the supports in fired heaters and boilers are also included in the PMI program.

• All alloy steel bolting, fasteners and nuts.

• Ring joint flange and clamp type (e.g., Grayloc) connector flange gaskets.

• Internal non-pressure-containing parts. Metallic alloy components for refractory linings (e.g., refractory anchors and hex mesh) shall be covered under this requirement.


Related Discussions:- Process of alloy materials sampling

Determine the loss-by-defect and loss-by-dispersion, Determine the loss-by-...

Determine the loss-by-defect and loss-by-dispersion Given, Annual production = 1,00,000 units Specification = 20 ± 4  i.e. m = 20, Δ = 4 Cost of repairing or resetting a

Corrosive properties of caustic, Q. Corrosive properties of caustic? So...

Q. Corrosive properties of caustic? Sodium hydroxide, more commonly known as Caustic Soda or simply ‘Caustic', is widely used in the petrochemical industry to neutralize acidic

Welding, what is blow hole defect ?

what is blow hole defect ?

Engine, What is ignition angle offset

What is ignition angle offset

Determine the value of maximum bending moment, Determine the value of maxim...

Determine the value of maximum bending moment: Draw the shear force & bending moment diagrams for the beam overhanging on both of sides as illustrated in Figure. Determine the

Module site installation preparation, Q. Module Site Installation Preparati...

Q. Module Site Installation Preparation? The following tasks shall be accomplished at the Facility site prior to setting the modules on the piles: After module support piles

Solid modeling design, Solid Modeling Design Create a solid model for on...

Solid Modeling Design Create a solid model for one of the following case studies listed below (all subsystems/subassemblies are indicative): Use Solid Works CAD software. A- Ca

Group technology and cellular manufacturing, write a VB programme that comp...

write a VB programme that compute the binary ordering algorithm for unlimited number of machines and parts

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd