Problems in turbid water - underwater inspection of bridge, Civil Engineering

Assignment Help:

Define Problems in turbid water - underwater inspection of bridge?

There are three main problems, which limit the viewing performance of an underwater camera. These are:

- Absorption

- Refraction

- Reflection

Absorption reduces the amount of illuminating light that reaches the object from the light source.  It also reduces the amount of light reaching the camera from the object.  This combined absorption of light limits the maximum distance between the camera and the object.  The viewing range is proportional to the power of the light source, and the light sensitivity of the camera used.

The process of refraction causes dispersion of light from the light source across a larger area than would occur in clear water, thus reducing the intensity of the light beam. The light coming back from the subject to camera is also reduced and scattered in a similar fashion causing loss of contrast and image detail in the video signal.

Reflection is probably the most critical factor for the performance of cameras in turbid water. The suspended particles in the path of illuminating light reflect a portion of the illuminating light directly back into the camera.

This backscatter, can often be limiting factor in the use of underwater visual imaging system in turbid water.  The illuminating light reflected back from the suspended particles tends to "swamp" the imaging light from the subject.

 


Related Discussions:- Problems in turbid water - underwater inspection of bridge

Dam, types of dam

types of dam

Define the void ratio and specific gravity of particles, Derive the formula...

Derive the formula among soil moisture content (w), degree of saturation (S), specific gravity (G), and void ratio (e). Saturated clay has a water content of 40% and bulk specif

Heating season duration , Change the model to take into account the variati...

Change the model to take into account the variation in outdoor temperature for a "typical" day in the heating season based on the heat loss by the fabric and the heating of incomin

Scheme of some smaller piles with same load capacity, Question Which wi...

Question Which will be a better choice, a large diameter piles or a scheme of some smaller piles with same load capacity ? Answer Choice of a large diameter pile suff

Landslides - road under special conditions, Landslides: Landslides ar...

Landslides: Landslides are common in the Himalayan hill roads. The main causes contributing to landslides are: (a) Removal of lateral support at the bottom of a hill due t

Define safety precaution for underwater inspection of bridge, Define Safety...

Define Safety Precautions for Underwater Inspection of Bridge? The working agency should have its own diving safety manual, which should be strictly followed. This manual shoul

Determine the allowable pressue, The data profile as shown in Figure is obt...

The data profile as shown in Figure is obtained. A best average of N values gave N 10 = 21, column loads including dead and live loads ranged from 500 kN to 950 kN. Determine the

Wall method of estimation, 1. Can you enumerate the benefits of individual ...

1. Can you enumerate the benefits of individual wall method of estimation? 2. Estimate the single room of size 3m x 4m x height 3m  using individual wall method? 3. Which met

#title., desirable properties in green concrete

desirable properties in green concrete

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd