Problems in turbid water - underwater inspection of bridge, Civil Engineering

Assignment Help:

Define Problems in turbid water - underwater inspection of bridge?

There are three main problems, which limit the viewing performance of an underwater camera. These are:

- Absorption

- Refraction

- Reflection

Absorption reduces the amount of illuminating light that reaches the object from the light source.  It also reduces the amount of light reaching the camera from the object.  This combined absorption of light limits the maximum distance between the camera and the object.  The viewing range is proportional to the power of the light source, and the light sensitivity of the camera used.

The process of refraction causes dispersion of light from the light source across a larger area than would occur in clear water, thus reducing the intensity of the light beam. The light coming back from the subject to camera is also reduced and scattered in a similar fashion causing loss of contrast and image detail in the video signal.

Reflection is probably the most critical factor for the performance of cameras in turbid water. The suspended particles in the path of illuminating light reflect a portion of the illuminating light directly back into the camera.

This backscatter, can often be limiting factor in the use of underwater visual imaging system in turbid water.  The illuminating light reflected back from the suspended particles tends to "swamp" the imaging light from the subject.

 


Related Discussions:- Problems in turbid water - underwater inspection of bridge

Borrow pits - embankment construction, Borrow Pits Borrow pits are th...

Borrow Pits Borrow pits are the locations from where the embankment soil is obtained. The following guidelines govern the location of borrow pits : (a) They should be pref

Explain mild and high-yield steel, High-yield steel vs. mild steel as road ...

High-yield steel vs. mild steel as road reinforcement High yield steel is the preferred material for the reinforcement of concrete carriageway due to the subsequent reasons:

Monitoring state of reclamation, Question Geotechnical Instrumentation ...

Question Geotechnical Instrumentation is often employed for monitoring state of reclamation . From time to time two piezometers are installed inside same borehole. What is mai

Plastic, what is plastic?its types and composition and its uses as engineer...

what is plastic?its types and composition and its uses as engineering material

Strenght of meterials 2, Difference between direct and bending stress diagr...

Difference between direct and bending stress diagrams

Cross section diagram of urban road, cross section diagram of urban roan in...

cross section diagram of urban roan in embankment,in cut,in eight lane,in conjusted area,divided hihgway

Define compression - actions in pot bearings, Define Compression - Actions ...

Define Compression - Actions in POT Bearings? Vertical load is carried through the piston of the bearing and it is resisted by the elastomeric pad. Elastomer is incompressible,

High Sulfate Soils, How do you treat High Sulfate soils, Gypsum? Is it good...

How do you treat High Sulfate soils, Gypsum? Is it good practice to build on it?

Fundamental purpose of surveying, give a brief definition of surveying and ...

give a brief definition of surveying and describe its fundamental purposes

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd