Problems formed while design of pre-stressed concrete, Civil Engineering

Assignment Help:

Determine the problems formed while design of pre-stressed concrete

Two types of problems are encountered by  the engineer engaged in the design of pre-stressed concrete members. These are normally referred to as  'analysis of  a member'  and  'design of  a member'.  In an analysis problem, determination of various types of  stresses and deformations  is made. These stresses are compared with the strength of  the member (in bending, shear and bond) to ascertain the safely and serviceability of  the structural member. In a design problem, selection and proportioning of an appropriate shape and size of  the member is done so  that the member is in a position to bear the stresses produced due to the application of loads. Provision of  reinforcement for reinforced concrete members, reinforcement and tendons for pre-stressed concrete members and suitable connections for steel members is to be made afterwards. Subsequent to the design of  a structural member, one has to once again analyse the designed section to confirm the safety of  the structural member.

 


Related Discussions:- Problems formed while design of pre-stressed concrete

Heat transfer, Three mechanisms: 1) Conduction - occurs in solids and st...

Three mechanisms: 1) Conduction - occurs in solids and stationary fluids (liquids or gases). 2) Convection - occurs in fluids. Change in the buoyancy of the fluid due to its

What is a feasibility study, In order to make wise investments in a marketp...

In order to make wise investments in a marketplace experiencing enhancing levels of risk, companies are turning to feasibility studies to verify if they should offer new products,

Doors and windows, important considerations in case of doors and windows

important considerations in case of doors and windows

Survey, explain ranging and reciprocal ranging

explain ranging and reciprocal ranging

State the term - post-tensioned concrete, State the term - Post-tensioned c...

State the term - Post-tensioned concrete In Post-tensioned concrete construction, as shown in Figure,  tendons are placed inside concrete and stretched after concrete has attai

Belt conveyors, Belt Conveyors: Belt conveyors are used for conveying ...

Belt Conveyors: Belt conveyors are used for conveying materials on a continuous basis. The materials usually handled are coal, mineral ores and stone. They are commonly instal

Calculate roller production, Calculate Roller Production An excavating ...

Calculate Roller Production An excavating contractor determined through a test strip, that a smooth steel-wheel vibrating roller compactor operating at 3-mph can compact a 6-in

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd