Airlifting is generally carried out before concreting to remove debris and clean the base of pile bores. It basically acts as an airlift pump by using compressed air. The setup of a typical airlifting operation is as follows: a hollow tube is placed centrally inside pile bore and a side tube is connected to the end of tube near pile bottom for the passage of compressed air inside the tube. Upper end of the tube is linked to a discharge tank for the circulation of pumped fluid from pile base.

Efficiency of airlifting operation is dependent on the performance of air compressor. At the time of airlifting, compressed air is piped down the tube and it returns up to discharge tank carrying it with the fluid. It functions by imparting energy to fluid and forces the fluid to move vertically upwards. Injected air mixes with the fluid, which leads to the formation of lower unit weight of combined mixture when compared with surrounding fluid. This hydrostatic pressure forces the air/fluid mixture up to the discharge tanks.


Related Discussions:- Principle of airlifting for cleaning pile bores

What is the long term effects - concrete, What is the Long Term Effects - C...

What is the Long Term Effects - Concrete Long term effects of  loads on structures consider all the effects including creep and shrinkage.

Yugty, #quesjjhjhhjtion..

#quesjjhjhhjtion..

Sign convention, i am very confuge in sign convention of bending moment,rea...

i am very confuge in sign convention of bending moment,reaction and shear force in moment distribution method so give any suitable anwer with couple?

Differentiate between concrete and tendons, Differentiate between concrete ...

Differentiate between concrete and tendons In the case of pre-tensioned concrete members, the transfer of prestress takes place due to the bond between concrete and tendons. In

Quality control of concrete roads, Quality Control of Concrete Roads: ...

Quality Control of Concrete Roads: Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly: (a) Strength, shape an

Internal energy, For a system   Q =W+ ΔE where ΔE is the change in E,...

For a system   Q =W+ ΔE where ΔE is the change in E, the stored energy in the  ΔE system. E has various forms   1. Kinetic Energy 2. Potential Energy Work do

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Define project scheduling - types of methods, Define Project Scheduling - T...

Define Project Scheduling - Types of Methods Project Scheduling - Distinction between the Major Types of Schedule Diagrams Precedence Diagrams (PDM)   a) Activ

Calculate time taken for consolidation in actual layer, A clay layer 5 m th...

A clay layer 5 m thick has double drainage. It was consolidated under a load of 127.5 kN/m2. The load is enhanced to 197.5 kN/m 2 . The coefficient of volume compressibility is 5.7

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd