Prepayment meters, Electrical Engineering

Assignment Help:

Prepayment Meters

Usage of prepayment meters will extensively improve the revenue collection of the utilities. There are a number of ways in that prepayment assures revenue protection. These are:

1. The prepayment meter assures revenue upfront in which is before the electricity is consumed. In case a credit is given (in prepayment) there is a zero time gap among consumption and payment. This decrease a cash collection cycle.

2. Errors in meter reading, billing and data entry are altogether eliminated as the meter dispenses only in which amount of electricity for that it has been paid for. Punching errors through consumers (in case of key pad based prepayment meters) are also eliminated, as the meter does not accept erroneous keying/punching.

3. Prepayment eliminates the meter readers and bill distributors thereby not only eliminating potential sources of corruption but also the costs incurred through utilities towards their meter readers and supervisors, and the workforce and associated costs in running the billing centres. The activity begin and ends in the cash collection, that happens by user friendly dispensation centres, and consumers do not have to queue at Utility offices to pay their bills.

4. The prepayment meter comes along with in-built load limiters that could be programmed to disconnect a meter in case the load is exceeded. This is through far most effectual in limiting the loading of the distribution system. This helps in avoiding overloading and thereby limiting the technical loss in service cables and avoiding hotspots in connections as the load always remains inside the permissible limits.

5.Another benefits of prepayment meter is its capacity to return (or dispense back) unused amount to the consumer. This characteristics helps in tracking changes in temporary ownership of connections (i.e., change of hands among one tenant to another) - an aspect that is never probable in credit metering.


Related Discussions:- Prepayment meters

Sui subtract immediate i instructions , SUI  Subtract Immediate I Instruct...

SUI  Subtract Immediate I Instructions The 8 bit  data  specified  in the  instruction  is directly  subtracted  from the  contents of  accumulator  and results  of operation

Find the rate of information transmission, Q. Find the rate of information ...

Q. Find the rate of information transmission? If the time occupied in transmitting each binary digit is 1 µs, find the rate of information transmission if 1 baud is equal to 1

Certification of energy managers, Certification of Energy Managers Ce...

Certification of Energy Managers Certification of Energy Managers and Accreditation of Energy Auditing Firms One of the important provisions in the Act is to create a cad

Electromagnetism, explain how can you find hysteresis loss from hysteresis ...

explain how can you find hysteresis loss from hysteresis loop

Effect of feedback on dynamic response and bandwidth, Q. Effect of feedback...

Q. Effect of feedback on dynamic response and bandwidth? Let us consider the block-diagram representation of the open-loop system shown in Figure 16.2.5(a), whose direct transf

Clampers, what would the change after adding a registor paralelly in clampe...

what would the change after adding a registor paralelly in clampers?

Find the minimum load resistor, Q. Consider the non inverting amplifier. Le...

Q. Consider the non inverting amplifier. Let R i = 1k and R f = 2k. Let the op amp be ideal, except that its output cannot exceed ±12 V at a current of ±10 mA. (a) Find the

General purpose registers, General  Purpose  Registers Registers B, C...

General  Purpose  Registers Registers B, C ,D, E H , and L   are 8 bit  general  purpose  registers. These  registers store  8 bit  data  temporarily  for processing. Some

Fourier Series, State by inspection (i.e. without performing any formal ana...

State by inspection (i.e. without performing any formal analysis) all you can about each of the periodic waveforms shown in FIGURE 1 in terms of their Fourier series when analysed

Compute the kvar and the power factor of the motor, Q. A three-phase balanc...

Q. A three-phase balanced load draws 100 kW at 0.8 power factor lagging. In order to improve the supply power factor to 0.95 leading, a synchronous motor drawing 50 kWis connected

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd