Prepayment meters, Electrical Engineering

Assignment Help:

Prepayment Meters

Usage of prepayment meters will extensively improve the revenue collection of the utilities. There are a number of ways in that prepayment assures revenue protection. These are:

1. The prepayment meter assures revenue upfront in which is before the electricity is consumed. In case a credit is given (in prepayment) there is a zero time gap among consumption and payment. This decrease a cash collection cycle.

2. Errors in meter reading, billing and data entry are altogether eliminated as the meter dispenses only in which amount of electricity for that it has been paid for. Punching errors through consumers (in case of key pad based prepayment meters) are also eliminated, as the meter does not accept erroneous keying/punching.

3. Prepayment eliminates the meter readers and bill distributors thereby not only eliminating potential sources of corruption but also the costs incurred through utilities towards their meter readers and supervisors, and the workforce and associated costs in running the billing centres. The activity begin and ends in the cash collection, that happens by user friendly dispensation centres, and consumers do not have to queue at Utility offices to pay their bills.

4. The prepayment meter comes along with in-built load limiters that could be programmed to disconnect a meter in case the load is exceeded. This is through far most effectual in limiting the loading of the distribution system. This helps in avoiding overloading and thereby limiting the technical loss in service cables and avoiding hotspots in connections as the load always remains inside the permissible limits.

5.Another benefits of prepayment meter is its capacity to return (or dispense back) unused amount to the consumer. This characteristics helps in tracking changes in temporary ownership of connections (i.e., change of hands among one tenant to another) - an aspect that is never probable in credit metering.


Related Discussions:- Prepayment meters

\, Refer to Figure 100. Assume MKS units. Given: R1= 4, R2=14, R3= 9, I4...

Refer to Figure 100. Assume MKS units. Given: R1= 4, R2=14, R3= 9, I4= 8, I5= 7. Determine: Ieq, Req, and V3.

Testing for continuity-earthing, Testing for Continuity : You may have obs...

Testing for Continuity : You may have observed sometimes that when all the connections in the appliance as well as the plug are made properly the appliance may still not work. Thi

Demand side management, Demand Side Management Demand side management ...

Demand Side Management Demand side management refers to programmes implemented through utilities to modify consumer load profile. Energy efficiency programmes decrease energy

Draw the circuit of battery having of three cells in series, One battery ha...

One battery having of three cells in series. External resistance is 5 Ω E.m.f each cell is 1.5V and internal resistance is 0.2?. Measure the current flow and draw the circuit.

The operation of colpitts oscillator, Q. Explain with the help of a circuit...

Q. Explain with the help of a circuit diagram,the operation of COLPITTS OSCILLATOR. Oscillator is a circuit used to generate a.c voltage without a.c.input signal.The energy to

Honer, Can I have formulas for calculation of 50TN seting on 33KV overhead ...

Can I have formulas for calculation of 50TN seting on 33KV overhead line

Magnitude comparator, circuit diagram of 2 bit magnitude comparator

circuit diagram of 2 bit magnitude comparator

Oscillator circuit with the help of block diagram, Q. Explain the condition...

Q. Explain the conditions to be satisfied for sustained oscillations in an oscillator circuit with the help of block diagram. The essential condition for sustained oscillations

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd