Prepayment meters, Electrical Engineering

Assignment Help:

Prepayment Meters

Usage of prepayment meters will extensively improve the revenue collection of the utilities. There are a number of ways in that prepayment assures revenue protection. These are:

1. The prepayment meter assures revenue upfront in which is before the electricity is consumed. In case a credit is given (in prepayment) there is a zero time gap among consumption and payment. This decrease a cash collection cycle.

2. Errors in meter reading, billing and data entry are altogether eliminated as the meter dispenses only in which amount of electricity for that it has been paid for. Punching errors through consumers (in case of key pad based prepayment meters) are also eliminated, as the meter does not accept erroneous keying/punching.

3. Prepayment eliminates the meter readers and bill distributors thereby not only eliminating potential sources of corruption but also the costs incurred through utilities towards their meter readers and supervisors, and the workforce and associated costs in running the billing centres. The activity begin and ends in the cash collection, that happens by user friendly dispensation centres, and consumers do not have to queue at Utility offices to pay their bills.

4. The prepayment meter comes along with in-built load limiters that could be programmed to disconnect a meter in case the load is exceeded. This is through far most effectual in limiting the loading of the distribution system. This helps in avoiding overloading and thereby limiting the technical loss in service cables and avoiding hotspots in connections as the load always remains inside the permissible limits.

5.Another benefits of prepayment meter is its capacity to return (or dispense back) unused amount to the consumer. This characteristics helps in tracking changes in temporary ownership of connections (i.e., change of hands among one tenant to another) - an aspect that is never probable in credit metering.


Related Discussions:- Prepayment meters

Find the maximum probable percentage error, Q. A current of 65 A is measure...

Q. A current of 65 A is measured with an analog ammeter having a probable error of ±0.5% of full scale of 100 A. Find the maximum probable percentage error in the measurement.

Design a circuit for indicate the connection of a battery, You are asked to...

You are asked to design a circuit that indicates if a 12 V battery has been connected the correct way around to two terminals, A and B. To do this, you have chosen to use a special

MUX, Is it used to replace the basic gates ?

Is it used to replace the basic gates ?

Magnetism, What is mgnomotive force

What is mgnomotive force

What are the types of write operations used in 8253, What are the different...

What are the different types of write operations used in 8253? There are two types of write operations in 8253 (1) Writing a control word register (2) Writing a count val

Name the flag bits available in 8085 microprocessors, Name  the flag bits a...

Name  the flag bits available in 8085 microprocessors. The 8085 microprocessor has five flags to show  five different  types  of data conditions .they are zero(Z),carry(CY),Sig

Which interrupt has the highest priority, TRAP has the maximum priority ...

TRAP has the maximum priority There are 2 types of interrupts external and internal. NMI has highest priority between all external interrupts,TRAP has highest priority between

Why the gain of the amplifier decreases if the ce is avoided, Q. Why the ga...

Q. Why the gain of the amplifier decreases if the CE is avoided? When the ce is connected in the circuit, ac signals get bypassed through it to the ground. In the absence of Ce

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd