Prepayment meters, Electrical Engineering

Assignment Help:

Prepayment Meters

Usage of prepayment meters will extensively improve the revenue collection of the utilities. There are a number of ways in that prepayment assures revenue protection. These are:

1. The prepayment meter assures revenue upfront in which is before the electricity is consumed. In case a credit is given (in prepayment) there is a zero time gap among consumption and payment. This decrease a cash collection cycle.

2. Errors in meter reading, billing and data entry are altogether eliminated as the meter dispenses only in which amount of electricity for that it has been paid for. Punching errors through consumers (in case of key pad based prepayment meters) are also eliminated, as the meter does not accept erroneous keying/punching.

3. Prepayment eliminates the meter readers and bill distributors thereby not only eliminating potential sources of corruption but also the costs incurred through utilities towards their meter readers and supervisors, and the workforce and associated costs in running the billing centres. The activity begin and ends in the cash collection, that happens by user friendly dispensation centres, and consumers do not have to queue at Utility offices to pay their bills.

4. The prepayment meter comes along with in-built load limiters that could be programmed to disconnect a meter in case the load is exceeded. This is through far most effectual in limiting the loading of the distribution system. This helps in avoiding overloading and thereby limiting the technical loss in service cables and avoiding hotspots in connections as the load always remains inside the permissible limits.

5.Another benefits of prepayment meter is its capacity to return (or dispense back) unused amount to the consumer. This characteristics helps in tracking changes in temporary ownership of connections (i.e., change of hands among one tenant to another) - an aspect that is never probable in credit metering.


Related Discussions:- Prepayment meters

Describe the uses of GPS map, Describe the uses of GPS map This is far...

Describe the uses of GPS map This is far safer because a driver of a vehicle doesn't have to consult maps while driving. It also removes error (for example going the wrong way

Direct current charging and discharging circuit, 1. The circuit shown belo...

1. The circuit shown below is a DC charging and discharging circuit. a. At t = 0 sec, switch S1 is thrown to position 1 ("pos1"). Write the mathematical expressions for V

Parabola by offset method, how many points are required to make an parabola...

how many points are required to make an parabola in offset method when vertical point has 4 points

Constant frequency system, Constant Frequency System In this  system c...

Constant Frequency System In this  system chopping period  T is kept constant but the  on time T om is varied. This  system is also referred to pulse with modulation or time

Applied electronics, What is coupling? Explain the types of coupling

What is coupling? Explain the types of coupling

Calculate the impedance, What is the impedance Z between terminals A and B ...

What is the impedance Z between terminals A and B of the networks shown below? Express your answers in polar form. Three voltages represented by v 1 (t)=100cosωt, v 2 (t)=7

Diode transistor logic gate, A circuit realization of a NAND gate will now ...

A circuit realization of a NAND gate will now be developed. By connecting NAND gates together in various ways, one can synthesize other gates and flip-flops. Thus in principle, a s

Microprocessors, Memory location 2000H has the word 5000H stored in it. Wha...

Memory location 2000H has the word 5000H stored in it. What does each location contain after DEC WORD PTR [2000H].

Determine voltage on the self-biased n-channel, Measurements made on the se...

Measurements made on the self-biased n-channel JFET shown in Figure are V GS =-1 V, I D = 4 mA; V GS =-0.5V, I D = 6.25 mA; and V DD = 15 V. (a) Determine V P and I DSS .

Ldax load accumulator indirect instruction , LDAX  Load Accumulator Indire...

LDAX  Load Accumulator Indirect Instruction This instruction is used to copy data  from memory  location pointed by register  pair only  BC or DE  to the accumulator  HL pair

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd