Preparation for Underwater Inspection - Availability of Tools and Equipment

The engineer-in-charge, before taking up the inspection, should list out the complete equipment required for the inspection and ensure that they are working properly. The following equipment would generally be necessary.

- Boats with oars, motor and life preservers

- Diving gears

- Portable flashlight

- Surface cleaning tools, e.g. brushes, scrapers

- Easy-to-read measuring tape

- Knife, hand scraper and hammer

- Sounding gear for determining depth

- Other measuring devices

- Recording devices such as still and video cameras, Plexiglas, and grease pencil.

- Safety equipment In addition to above, specialised equipment may be required to be kept ready for non-destructive testing of material. At occasions, partially destructive testing equipment and equipment for taking samples e.g. core cutting equipment may also be required.


Related Discussions:- Preparation for underwater inspection - tool and equipment

Protection of lorry on the line, i. On single line by one or two men as req...

i. On single line by one or two men as required following and proceeding the lorry at a distance of 600 m. on the BG and 400 m. on the MG & NG carrying a banner flag across the tra

Compaction to freshly placed concrete piles, Compaction to freshly placed c...

Compaction to freshly placed concrete piles  In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compact

Calculate the surface dimensions of sedimentation tank, Calculate the surfa...

Calculate the surface dimensions of Sedimentation Tank A treatment plant upgrade calls for design of sedimentation basins to handle a flow rate of 8 MGD. The basins are for a T

Railway drawings, section of railway tracks in india ,all dimensions in met...

section of railway tracks in india ,all dimensions in meters

Geo Technical Project, I have a geo technical Project that I need to be sol...

I have a geo technical Project that I need to be solved correctly and accurately within 15 hours exact, please. Steps and details must be included. Thanks a lot and let me know ASA

Raking piles of bridge abutment placed under an embankment, Question It sho...

Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with div

One-way pre stressing vs two-way pre stressing, Q. One-way pre stressing vs...

Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo

Determine the probable period of time, A clay stratum is 4.5 m thick and re...

A clay stratum is 4.5 m thick and rests on a rock surface. The coefficient of consolidation of a sample of this clay was found to be 4.5 × 10-8 m 2 /s in the laboratory. Verify pro

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd