Preparation for underwater inspection - tool and equipment, Civil Engineering

Assignment Help:

Preparation for Underwater Inspection - Availability of Tools and Equipment

The engineer-in-charge, before taking up the inspection, should list out the complete equipment required for the inspection and ensure that they are working properly. The following equipment would generally be necessary.

- Boats with oars, motor and life preservers

- Diving gears

- Portable flashlight

- Surface cleaning tools, e.g. brushes, scrapers

- Easy-to-read measuring tape

- Knife, hand scraper and hammer

- Sounding gear for determining depth

- Other measuring devices

- Recording devices such as still and video cameras, Plexiglas, and grease pencil.

- Safety equipment In addition to above, specialised equipment may be required to be kept ready for non-destructive testing of material. At occasions, partially destructive testing equipment and equipment for taking samples e.g. core cutting equipment may also be required.


Related Discussions:- Preparation for underwater inspection - tool and equipment

Why is the statue of liberty made of copper, Copper is a very durable mater...

Copper is a very durable material when exposed to weather and is soft enough that it can be simply molded to curved shapes like those in the Statue of Liberty. It is also tradition

Foundation, classification of foundation

classification of foundation

Strength of Materials, Describe the process of yielding and state the effec...

Describe the process of yielding and state the effect work hardening has on the yield point of mild steel using suitable sketches where appropriate.

Find out the joint distribution, Find out the joint distribution: Let ...

Find out the joint distribution: Let X I and X 2 be two independent random variables each distributed uniformly in the interval [ 0, a ], where a > 0 is a constant. Find out

Calculate the diameter of the stockpile, 1. On a 5-acre level terrain build...

1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft su

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd