Prepaid meters, Electrical Engineering

Assignment Help:

Prepaid Meters

Prepaid metering is a system whereby consumers purchase electricity by a smart card. The amount paid together along with other information is encoded in the smart card. In sequence to transfer the credit, the consumer inserts the card within the meter. The meter reads the data and whiles the paid for energy has been exhausted, the consumer gets the card reloaded/ reprogrammed. The system has the ability of programming along with time of use tariffs, multiple rates and etc.

The use of prepaid meters results in almost total elimination of non- payment and delayed payment and enables transfer of reliable, correct and up to date consumption and billing data according to tariff policy in use. This information can be utilized by the utility for demand forecasting and for controlling peak demands. It also means substantial reduction in staff for meter reading, bill complaints, bill serving, and bad debts, etc. Full meter programmability allows maximum flexibility in changing tariffs. Consumer can also decide in advance the affordable level of expenditure, which helps him and the utility in elimination of disputes regarding inaccurate bills.


Related Discussions:- Prepaid meters

Compute the real power and inductive load, Q. A 60-Hz, 440-V, three-phase s...

Q. A 60-Hz, 440-V, three-phase system feeds two balanced wye-connected loads in parallel. One load has a per-phase impedance of 8 + j3  and the other 4 - j1 . Compute the real po

Specific orientation programme, Specific orientation programme: at this st...

Specific orientation programme: at this stage, induction is conducted by the foreman. Induction is specific and requires skill on the part of the foreman. A new employee must be p

What is the purpose of carry flag and zero flag, What is the purpose of car...

What is the purpose of carry (c) flag and zero (z) flag? Carry flag conatins the carry after addition or borrow after subtraction. This carry flag also shows error conditions,

Design a water supply scheme for a station, Q. Design a water supply scheme...

Q. Design a water supply scheme for a station, adopting the following data - a) Source of water - River flow at a distance of 1 km. b) Requirement of water - 1 lack gallons p

Drift related to the instruments, If the instruments has no drift it is per...

If the instruments has no drift it is perfectly reproducible. No drift means that with a given input the measured values do not vary with time. Drift may be classified into thre

What do you understand by dram and its refreshing, What do you understand b...

What do you understand by DRAM and its refreshing? Dynamic RAM (DRAM) is fundamentally the same as SRAM, but this retains data for only 2 or 4 ms on an internal capacitor. But

Digital electronics, With the use of clocked JK flip-flops, draw and explai...

With the use of clocked JK flip-flops, draw and explain the working principle of a 3-bit binary ripple counter.

Electromechanical meters, Electromechanical Meters Electromechanical e...

Electromechanical Meters Electromechanical energy meters are based on the Ferraris Principle (see note in the margin). The working of these meters is explained. Working o

Binary coded decimal to decimal conversions, Binary Coded Decimal to Decima...

Binary Coded Decimal to Decimal Conversions • Step1. Break up the Binary Coded Decimal number into 4 bit binary number, starting from the least significant binary bit. • Step2

Calculate the stator input current, Q. Calculate the stator input current? ...

Q. Calculate the stator input current? The parameters of the equivalent circuit shown in Figure for a three-phase, wye-connected, 220-V, 10-hp, 60-Hz, six-pole induction motor

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd