Q. Preloading - Control of settlements?
This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. The soil strata will settle due to preloading. Later, remove the preload and construct the structure. The period of preloading depends on the time rate of settlement. Hence, if the rate of settlement is slow, then, period of preloading will be too long. The compression under preloading will be very rapid in porous soils with low relative density. Rebound after removal of preload is also less in such soil deposits. Addition of water during preloading may be advantageous, since it breaks the weak bonds in strata having silts and loosely packed sands. Organic silts, peats, sanitary fills can be precompressed effectively by preloading. Lowering of ground water table also contributes for preloading.
Reloading in the site is time consuming in soils where consolidation settlement is important unless drainage facility like sand drainslband drains, well points, electro-osmosis methods are used along with preload. Reloading is generally adopted in poor soils with relatively high water contents. With preloading, unless drainag; is rapid, pore pressure build up will take place, reducing the shear strength.
how does the particle number and size affect the slurry flow in a centrifugal pump?!
Q. Necessity of air voids in bituminous pavement? If the presence of air voids is too high, it results in an increase of permeability of bituminous pavement. This enables the f
The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c
Q. Indirect tensile strength in water-retaining structures ? Crack width formation is dependent on the early tensile strength of concrete. Principle of critical steel ratio als
derivation for strain energy stored in a body due to torsion
ropeways
measurement of gauge box for sand ?
what is the design of syphon
Define Channel Jig a) A channel jig is the simplest form of box jig. b) The work is placed in a channel shaped trough and clamped by mean of screw. c) It is utilized
what is the waste utilisation?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd