Why are two gate regulators necessary in regular practice to form washout regulators?
Answer
In fact, situation is analogous to that of fire hydrants in that two gates valves are installed with a on its own fire hydrant. Washout valves are used for regular maintenance work of watermain like allowing flowing out of water throughout cleaning of watermain. At junction anywhere a tee-branch out to a washout point, a gate valve is installed to divide two pipelines. However, this gate valve is open throughout normal operation as another gate valve further downstream is installed. If downstream gate valve is not installed in position, then pipe section of branched-out watermain will be left dry during normal operation and there is a high probability that break to watermain and frequent leakage would happen. With downstream gate control device installed, segment of branched-out watermain consists water in regular operation. In a case there is any leakage, it be able to be readily detected by using two gate regulators.
Mechanism of taking up loads for concrete paving blocks Paving for concrete blocks comprises closely packed paving blocks in pre-determined patterns and tiny joint spaces bet
Explain the Toxic Characteristics - Hazardous Waste - From the results of either - Extraction Procedure(EP) toxicity (prior to March 1990) or Toxicity Characteristic Leachi
Carry out research to Analyse and Evaluate: a. The potential problems that lightning strikes to an aircraft in flight could create. b. How design features and maintenance
Q. Explain about Catch Sidings? Normally all catch sidings except those which are sanded shall be kept alive. On sanded catch siding, the rails shall be kept clear of sand for
How to calculate the centroid of parabola?
A retaining wall with a vertical back 5 m high supports cohesion less backfill of unit weight of 19 kN/m 3 . The upper surface of the backfill rises at an angle of 10° with the hor
Process to calculate the Initial Tension The maximum stress induced in the prestressing tendon at the time of the stressing operation is known as initial tension in tendons. T
Explain the Installation of Shock Transmission Unit? It is not always necessary to install STUs while a structure is under construction but the holding down anchor bolts and th
1 advantages and disadvantages of rise and fall methodes
which Subject that wants civil engineers?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd