1. Establish importance of Distribution Planning with help of suitable example.
2. Explain different distribution planning methods.
3.Explain the six level intervention strategy adopted by Ministry of Power for bring distribution sector reforms.
4. Explain the concept of customer indexing. Use suitable examples.
5. Illustrate some of the non-traditional ways of metering.
6. Illustrate the advantages and disadvantages creating a profit centre.
7. What do you understand by Customer relationship management? How relevant it is for power distribution sector?
8. Explain the consumer grievance handling procedure for a power distribution company.
SBB Instruction This instruction is used to subtract the contents of register or memory location with carry flag from accumulation. The results of operations is stored
Q. A magnetic circuit is found to have an ac hysteresis loss of 10 W when the peak current is Im = 2 A. Assuming the exponent of Bm to be 1.5, estimate Ph for Im = 0.5A and 8A.
1. Work out the voltage for the following arrangement of 1.5V cells : (to achieve a pass grade, solve problems with cells in series, parallel and series-parallel) 2.
explain the proprty and the application of carbon and tungsten in lamp?
Break over voltage of Finger Voltage The minimum forward voltage when the gate is opened at which SCR starts conducting heavily is called the break over voltage. To
Q. The flux-density distribution produced in a two - pole synchronous generator by an acexcited field winding is B(θ, t) = B m sin ω 1 t cos θ Find the nature of the armatur
Followings are some disadvantage a. Higher latching and holding current b.Higher on state voltage drop and power losses c.Higher gate current d.Higher gat
difference between path fuction and point fuction
PRINCIPLE OF LED
Multiple Tariff Meters or TOU Meters Time of use metering facilitates load control and planning on the part of utilities. This is efficiently achieved using a concept known as
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd