Q. Potential advantages of segmental tunnelling when compared with hand-shield pipe-jacking?
In segmental tunnelling, jacks are installed at the shield so that itisn't necessary to install thrust wall at the jacking pit. This provides the opportunity for smaller size of pit because of the absence of thrust wall. Also as the jacking operation includes the jacking of small length of segmental liner plates and consequently smaller force would be required for pipe jacking when compared with traditional pipe jacking (jacks at jacking pits) where jacking force is needed to overcome long lengths of pipe drives. Alternatively, the use of segmental tunnelling provides better control in alignment since the steering operation could be performed at the shield.
State the method of Pre- Tensioning It is a method of prestressing concrete in which tendons are stretched or tensioned before concreting. In this form of construction, concr
Q. Write short notes on the following : a) Points to be kept in mind while collecting water samples for testing from tap, stream & T/well separately. b) Where and why foot
I.S. CODES ON EARTHQUAKE RESISTANT BUILDING DESIGN Bureau of Indian Standard has divided the country into five zones depending upon the severity of earthquake after observing
how to measure the waterways of railway bridges
a soil sample is 38mm in diameter and 76mm and in its natural condition weighs 168g.when dried completely in an oven weighs 13o.5g.the value of Gs is 2.73.what is the degree of sat
what is road survey ?
what is the yield stress for reinforcement steel?
what happens to concrete when under vibrated
explain re inforced brick work?
When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd