Q. Potential advantages of segmental tunnelling when compared with hand-shield pipe-jacking?
In segmental tunnelling, jacks are installed at the shield so that itisn't necessary to install thrust wall at the jacking pit. This provides the opportunity for smaller size of pit because of the absence of thrust wall. Also as the jacking operation includes the jacking of small length of segmental liner plates and consequently smaller force would be required for pipe jacking when compared with traditional pipe jacking (jacks at jacking pits) where jacking force is needed to overcome long lengths of pipe drives. Alternatively, the use of segmental tunnelling provides better control in alignment since the steering operation could be performed at the shield.
Distinguish between dry and wet corrosion
how to draw an elipse
can we provide base isolation for high rise buildings ? Can we provide it for diagrid structures? if; yes Up to which no of storeys
the propane gas tank has an inner diameter of 1500mm and wall thickness of 15mm. If the wall is pressurized to 2MPa, determine the absolute maximum shear stress in the wall of tank
EXPLAIN THE PROCEDURE FOR PREPARATION OF DRAWING USING AUTOCAD FOR RAPID SAND FILTER
Low Cost Roads Connecting Villages: Problem of Village Connectivity It is estimated that nearly 45 per cent of India's villages are not connected by an all-weather ro
Design of prestressed concrete pipes The design of prestressed concrete pipes should cover the following five stages : (a) Circumferential prestressing, winding with or wit
A retaining wall 9 m high retains cohesion less soil, with an angle of internal friction 33°. The surface is level with the top of the wall. The unit weight of the top 3 m of the f
Question What is main mechanism of formation of soil plugs in marine driven steel piles with reinforced concrete infill? Answer Throughout initial driving process, ope
Askobstacles I ranging andsurvey question #Minimum 100 words accepted#
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd