Potential advantages of segmental tunnelling, Civil Engineering

Assignment Help:

Q. Potential advantages of segmental tunnelling when compared with hand-shield pipe-jacking?

In segmental tunnelling, jacks are installed at the shield so that itisn't necessary to install thrust wall at the jacking pit. This provides the opportunity for smaller size of pit because of the absence of thrust wall. Also as the jacking operation includes the jacking of small length of segmental liner plates and consequently smaller force would be required for pipe jacking when compared with traditional pipe jacking (jacks at jacking pits) where jacking force is needed  to overcome long lengths of pipe drives. Alternatively, the use of segmental tunnelling provides better control in alignment since the steering operation could be performed at the shield.


Related Discussions:- Potential advantages of segmental tunnelling

Collapse mechanisms in unsymmetrical portal frames, How to find beam,sway a...

How to find beam,sway and combined mechanisms for unsymmetrical portal frames? Also how to find the critical mechanisms by using plotting method?

Glazed tiles for construction material, Q. Glazed tiles for Construction Ma...

Q. Glazed tiles for Construction Material? Glazed tiles are only meant for dadoes of bath room, Toilet and kitchens etc as they have no strength . Normally 8'' x 4'' g

Unloaded propped, Ask questa) In an unloaded propped cantilever, the proppe...

Ask questa) In an unloaded propped cantilever, the propped end sinks vertically relative to the fixed end by an amount ? due to poor construction of the foundation of the prop. Wha

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Cement, List the ingredients of cement And their functions

List the ingredients of cement And their functions

Explain the frame member''s effective lengths, Explain the Frame member's e...

Explain the Frame member's effective lengths 1. Effective length is a product of an effective length factor (k) and the actual length of the column. 2. k depends on th

Survey, Operation in chain surveying

Operation in chain surveying

Test on specially moulded test piece, Test on specially moulded test piece ...

Test on specially moulded test piece The test piece shall be moulded by the manufacturer with identical compound and under identical vulcanizing conditions as used in manufact

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd