Q. Potential advantages of segmental tunnelling when compared with hand-shield pipe-jacking?

In segmental tunnelling, jacks are installed at the shield so that itisn't necessary to install thrust wall at the jacking pit. This provides the opportunity for smaller size of pit because of the absence of thrust wall. Also as the jacking operation includes the jacking of small length of segmental liner plates and consequently smaller force would be required for pipe jacking when compared with traditional pipe jacking (jacks at jacking pits) where jacking force is needed  to overcome long lengths of pipe drives. Alternatively, the use of segmental tunnelling provides better control in alignment since the steering operation could be performed at the shield.


Related Discussions:- Potential advantages of segmental tunnelling

What are advantages and disadvantage of varnishing, Q. What are advantages ...

Q. What are advantages and disadvantage of varnishing? Varnish is a clear pale solution of a resinous substance ( like amber, common resin, copal, lac, or shellac 0 dissolved i

What is the required bracing location for the beam, A contractor has select...

A contractor has selected a W14x74 simply supported beam for a high rise construction project.  The span length for the provided beam is set at 30 feet.  The maximum factored appli

Correction in bearing, write a c program To compute interior angles and cor...

write a c program To compute interior angles and correct them for observational errors and adjusting the bearing of remaining sides when the bearings taken on a closed compass trav

Calculate the equivalent uniform annual cost, A contractor purchased an exc...

A contractor purchased an excavator for $100,000. The life expectancy is 10-years. With the annual interest rate at 7%, the annual cost for the excavator is most nearly: Solutio

Define the thiem equations for confined aquifers, Define the Thiem Equation...

Define the Thiem Equations for Confined Aquifers   Using natural log:  Q = 2pKm(h 2 - h 1 )/ln(r 2 /r 1 )   Using log 10 :    Q = 2Km(h 2 - h 1 )/((1055)log(r 2 /r 1 ))

Concreat, m25 mix water cement ratio

m25 mix water cement ratio

I am expert i this field, i require a workquestion #Minimum 100 words acce...

i require a workquestion #Minimum 100 words accepted#

Explain the stopping sight distance, Explain the Stopping Sight Distance ...

Explain the Stopping Sight Distance Stopping Sight Distance Is the Sum of Two Distances (1) The distance traversed by the vehicle from the instant the driver sights an objec

Afflux on account of obstruction to flow, Q. Afflux on account of obstructi...

Q. Afflux on account of obstruction to flow? Even if the river constriction on account of approach banks is not excessive and bridge waterway is wider than that causing critica

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd