Point of virtual fixity and critical length of lateral loading for piles

Some engineers can get confused about the difference between the two terms which are point of virtual fixity and critical length used for piles for resisting lateral loads. Meant for critical length of lateral loading for piles, it denotes to a certain depth from the ground level where piles act as if it were infinitely long. Beyond the critical length, change in lateral response of piles with increase in pile length would be negligible.

Point of virtual fixity denotes to a certain dept below ground surface where piles are fixed without movement under loads. Depth to the point of fixity is helpful in assessing the buckling loads of piles. It is obvious that depth to the point of virtual fixity must be smaller than critical length of piles.

421_Arrangement of piles in a pile cap to reduce bending moment.png


Related Discussions:- Point of virtual fixity of lateral loading for piles

Fluid Mechanics, A 4-m-long, 6-cm-diameter cylinder placed normal to the fl...

A 4-m-long, 6-cm-diameter cylinder placed normal to the flow is used to measure the velocity of an air stream. If a force of 50 N is measured, the air velocity is nearest (for air

Planning stage of the audit, Materiality is used only at the planning stage...

Materiality is used only at the planning stage of the audit. Ans: I disagree with the statement because: When planning the audit, the auditor considers what would make the fi

Micro-organism ratio, Micro-organism ratio: Determine the F/M ratio (i...

Micro-organism ratio: Determine the F/M ratio (in units of lbs BOD5/lb MLSS-day) using data provided in the above example problem. Solution By definition, F/M = Q S

Stacking of materials for building, briefly explain the stacking of materia...

briefly explain the stacking of materials in the site for general building?

Transportatoin engineening, explain the construction while aligning roads o...

explain the construction while aligning roads on hilly areas

Single flemish bond, advantages and disadvantages in single flemish bond

advantages and disadvantages in single flemish bond

Topographical survey and preparation of drawings, Topographical Survey and ...

Topographical Survey and Preparation of Drawings: Topographical Survey for a road project consists of three sequential stages: (a) Reconnaissance Survey, including a study

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd