plinth wall, Civil Engineering

Assignment Help:
is it necessary for to put plinth wall in buildings

Related Discussions:- plinth wall

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Settlement due to lowering of water table, Q. Settlement due to Lowering of...

Q. Settlement due to Lowering of Water Table? Water table is encountered with, whenever any excavations are made for foundations. The water is to be out for working conditions.

How to design shape of guide bunds, Q. How to design Shape of guide bunds? ...

Q. How to design Shape of guide bunds? Alignment of guide bunds converging on the upstream was considered by Bell, Spring and Gales to allow for the waterway obstructed by pier

What is the meaning of term - slip in anchorage, What is the meaning of ter...

What is the meaning of term -Slip in Anchorage In the case of post-tensioned concrete, when the tendons are anchored at the ends of concrete members, a slip of  tendons takes

Beams of uniform strength, determine the cross section of a rectangular bea...

determine the cross section of a rectangular beam of uniformly strength for a simply supported beam of 6m span subjected to central concentrated load of 20kN a)by keeping depth of

Major functions of features observed in a typical manhole, Question Wha...

Question What are the major functions of following features observed in a typical manhole ? Answer (i) Groove near benching, (ii) R.S.J. (iii) double seal manhole cove

Determine the coefficient of compressibility, A saturated clay layer 4 m th...

A saturated clay layer 4 m thick is located 6 m below GL. The void ratio of the clay is 1.0. When a raft foundation is located at 2 m below GL, the stresses at the top and bottom o

CAD IN CIVIL ENGINEERING DRAWING LAB, EXPLAIN THE PROCEDURE FOR PREPARATIO...

EXPLAIN THE PROCEDURE FOR PREPARATION OF DRAWING USING AUTOCAD FOR RAPID SAND FILTER

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd