Planning stage of the audit, Civil Engineering

Assignment Help:

Materiality is used only at the planning stage of the audit.

Ans: I disagree with the statement because:

When planning the audit, the auditor considers what would make the financial information materially misstated. The auditor's assessment of materiality and audit risk is used not only at audit planning stage rather it is also applied at evaluating the results of the audit procedures.


Related Discussions:- Planning stage of the audit

About distomat, what is distomat? functipns &properties

what is distomat? functipns &properties

Concrete, What practical steps can one take to mitigate the adverse effects...

What practical steps can one take to mitigate the adverse effects in using aggregates with higher than specified flakiness index in the production of concrete

Calculate the elastic stretch of the steel wire rope, A 70-ft long, ¾" diam...

A 70-ft long, ¾" diameter, 6 x 7 FC wire rope is resisting a tension force of 12-kips.  The elastic stretch of the steel wire rope given the following properties is most nearly: E

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

State an expression for zero air-void line, State an expression for 'zero a...

State an expression for 'zero air-void line' and illustrate the line for a specific gravity of 2.65. What are the various factors that affect the compaction of soil in the field

Softening test point, the importance of softening point of a bitumen materi...

the importance of softening point of a bitumen material in the design of a pavement

Steel and timber structures, design a tension member subjected to a pull of...

design a tension member subjected to a pull of 300KN using a channel section. the length of a joint available is only 400mm.check the condition of using lug angle for end connecti

Explain the process of directed track maintenance, Q. Explain the process o...

Q. Explain the process of Directed Track Maintenance? DTM is a method to maintain the track is directed every day and not as a prescribed routine. DTM essentially consists of n

Explain energy grade line (egl), Explain Energy Grade Line (EGL) Graph ...

Explain Energy Grade Line (EGL) Graph of the sum of the potential, pressure and kinetic energies along a pipe or open channel. Energies are plotted along the y-axis above a dat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd