Energy research worldwide is assuming top priority, in particular because of economic, en - vironmental, and resource constraints. DOE (Department of Energy) was established in the United States in 1977. A major private utility sponsored energy research organization, EPRI (Electric Power Research Institute) in Palo Alto, California, has been in existence since 1972. In addition, large utility companies, such as AEP (American Electric Power), have their own research programs.

The major goals for the future are:

• New primary resources (such as nuclear fusion and solar energy) for electric bulk power generation

• Development of better means of generation (such as superconducting generators) and transmission (such as six-phase)

• Emphasis on energy conservation (better utilization of electricity with less waste)

• Electric-energy storage facilities such as pumped storage, compressed gas, storage batteries, and superconducting magnetic coils.


Related Discussions:- Planning and research in power system

Stator current control methods - motor control , Stator  Current Control ...

Stator  Current Control Methods The torque  and speed  of an induction motor  can be  controlled  by the  stator  current  the motor  behaviour  is different from that with VS

Dc machines, commutator in d.c machine acts as... what????

commutator in d.c machine acts as... what????

Super-heterodyne receiver, Write a short explanation of the principles of s...

Write a short explanation of the principles of super-heterodyne receiver. It may help to use sample block diagram to state the process. Why is the production of the intermediate fr

Bipolar junction transistor, Bipolar junction transistor: Transistors ...

Bipolar junction transistor: Transistors are so named as they conduct via using both majority and minority carriers. The bipolar junction transistor that is abbreviated as BJT

Produce a storage scope using peripheral interface control, First section ...

First section Aim: the aim of this project is to produce a storage scope using a PIC. In this project, several samples were taken from an analog signal and stored in the memo

Find the efficiency of the transformer, Q. A three-phase, 600-kVA, 2300:230...

Q. A three-phase, 600-kVA, 2300:230-V,Y-Y trans-former bank has an iron loss of 4400Wand a full-load copper loss of 7600 W. Find the efficiency of the transformer for 70%full load

Show how a 16-to-1 multiplexer can be obtained, Q. Using two 8-to-1multiple...

Q. Using two 8-to-1multiplexers and one 2-to-1multiplexer, show how a 16-to-1 multiplexer can be obtained in the form of a block diagram.

Draw the power triangle for each load, Q. Two balanced, wye-connected, thre...

Q. Two balanced, wye-connected, three-phase loads are in parallel across a balanced, three - phase 60- Hz, 208-Vsupply. The first load takes 12 kWat 0.6 power factor lagging, and t

Find the minimum sum of products, Given that , f(a,b,c,d,e) = Σm (6,7,9,11,...

Given that , f(a,b,c,d,e) = Σm (6,7,9,11,12,13,16,17,18,20,21,23,25,28) using a Karnaugh map. (i) Find the essential prime implicants (ii) Find the minimum sum of product

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd