Payback period method, finance, Other Engineering

Assignment Help:
Non-discounted cash flow method,

Payback period method
In this method, time value of money is not considered. It takes into account the number of years required to recover the initial investment of a project (Harold Bierman, Seymour Smidt, 2006).
Accept Reject Rule:
Accept the project with lowest payback period.
Reject the project with highest payback period.
Merits:
1. Simple and easy to calculate
2. Less costly to use
3. Less time consuming
De-merits:
1. Time value of money is completely ignored.
2. Does not consider the cash flow generated after payback period.

Related Discussions:- Payback period method, finance

Infiltration enters, ways via which infiltration enters a sewer system

ways via which infiltration enters a sewer system

Drafting, what employment options are available in drafting

what employment options are available in drafting

Prepare a short document to sensitise public, Since the introduction of mob...

Since the introduction of mobile phones and other smart devices, concerns (both scientific and public) have been raised about the potential health impacts from regular use. Numerou

Means of escape - place of safety, Means of escape - place of safety: ...

Means of escape - place of safety: The means of escape in a building are often supplemented by a fire warning system that may or may not include automatic detection, depending

X rays., how x rays are produced?

how x rays are produced?

Fire precautions - fire protection engineering, Fire precautions - fire pro...

Fire precautions - fire protection engineering: Fire precautions include: Protecting escape routes in fire resisting construction, Providing fire doors between

Vertical spread, what are the no-arbitrage lower bound of the vertical spre...

what are the no-arbitrage lower bound of the vertical spread

Rated breaking torque, Consider a 3-hp, 220-V, 1800-r/min separately excite...

Consider a 3-hp, 220-V, 1800-r/min separately excited dcmotor controlled by a single-phase fully controlled rectifierwith an ac source voltage of 230Vat 60Hz.Assume that the full-l

Controller requirements, Controller Requirements  The requirements for ...

Controller Requirements  The requirements for the stability and performance of fight control systems are specified in the certi-fication requirements for U.S. civilian aircraft

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd