Q. Patching touch up stick?

Pipe requiring limited coating repair resulting from scars, slivers, holidays, etc. shall be repaired by an OWNER approved patching system. The amount of patching shall be limited to not more than two repairs per one metre length of coating (for example a maximum of forty eight (48) repairs on a 24 m joint). Any coating requiring patching in excess of this amount shall be re-coated.

Areas of pipe requiring small spot repairs shall be cleaned by a surface grinder to remove dirt, scale, rust, damaged coating or any other foreign material. Edges of the adjacent coating shall be feathered by hand sanding and all dust produced by cleaning and feathering shall be removed prior to patching. Defective coatings containing only pinholes do not require the full surface preparation. In these cases surface dirt, oil, grease or other contaminants which may impair the adhesion of the patching material shall be removed.

Only one of the following repair systems shall be used:

a) Patching touch up stick

b) Patching compound


Related Discussions:- Patching touch up stick

Extrusion, Difference between hot extrusion and cold extrusion

Difference between hot extrusion and cold extrusion

Compute a creative design solution, It is really significant of using a Gan...

It is really significant of using a Gantt chart in order to respect the deadline of a client. Show the five main areas that must be explored for a good time management. There

Materials, what is the meaning of 6061 and why its called as 6061?

what is the meaning of 6061 and why its called as 6061?

Piping inspection and test plan, Q. Piping Inspection and Test Plan? Pi...

Q. Piping Inspection and Test Plan? Piping Inspection and Test Plan review and Piping Materials Test Results review shall be by the Piping Materials group, or by / with assista

Feed speed-spindle rpm-cutting time material removal rate, A hole of 25 mm ...

A hole of 25 mm diameter and 62.5 mm depth is to be drilled. The suggested feed is 1.25 mm/rev.and the cutting speed is 60 m/min. Assume the clearance height is 5 mm. Determine: f

Urine preservatives - specimen collection, Urine preservatives - Specimen c...

Urine preservatives - Specimen collection: Urine preservatives : preservatives have different roles but are usually added to reduce bacterial action or chemical decompo

Curvilinear motion of a partical, Consider a particle and its path of trave...

Consider a particle and its path of travel.The position of a particle P at any time t can be described by specifying its: (a)Rectangular coordinates; X,Y,Z (b)Cylindrical coordinat

Compute the maximum bending moment, Compute the maximum bending moment: ...

Compute the maximum bending moment: A simply supported beam of 7 m length carries point loads 2 kN, 4 kN and 6 kN at distances of 1 m, 2 m & 4 m from the fixed end respectivel

Locomotive boilers, advantages and disadvantages of locomotive boilers

advantages and disadvantages of locomotive boilers

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd