Q. Patching touch up stick?
Pipe requiring limited coating repair resulting from scars, slivers, holidays, etc. shall be repaired by an OWNER approved patching system. The amount of patching shall be limited to not more than two repairs per one metre length of coating (for example a maximum of forty eight (48) repairs on a 24 m joint). Any coating requiring patching in excess of this amount shall be re-coated.
Areas of pipe requiring small spot repairs shall be cleaned by a surface grinder to remove dirt, scale, rust, damaged coating or any other foreign material. Edges of the adjacent coating shall be feathered by hand sanding and all dust produced by cleaning and feathering shall be removed prior to patching. Defective coatings containing only pinholes do not require the full surface preparation. In these cases surface dirt, oil, grease or other contaminants which may impair the adhesion of the patching material shall be removed.
Only one of the following repair systems shall be used:
a) Patching touch up stick
b) Patching compound
Laws of motion
What is Data Unification To optimize the UPR data structures, during design we study the semantics of each data type of the supported CAD systems and identify data types that a
Discuss the method of properties, manufacturing and applications of following cutting tool materials: (i) Carbides (ii) Ceramics (iii) Cubic Boron Nitride (CBN) What ar
Components of power plant &it''s functions
Application of smart material
Determine the eigen values and eigen vectors of the matrix
In selection of material handling equipment itself Hageman indicates that the final consideration are: 1. Methods of Installation: Operating controls should be accessibl
FLUX FEEDING & RECOVERY SYSTEM The flux is fed by gravity from the flux delivery hopper mounted on the welding head through a tube into the welding zone. Flux feeding is normally
Design a hydrocooling unit that can cool fruits and vegetables from 30 to 5 degrees Celsius at a rate of 20,000 kg/hr under the following conditions: The unit will be of flood typ
Q. Explain about Vessel Design Loads? Vessels and their supports shall be designed for all of the following conditions: • Erection: dead weight of fully dressed, empty vesse
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd