Two or more sections of piping (branches) of different diameters, lengths and/or pipe materials originating and terminating at common junctions

The flow in each branch will divide to make the head loss due to friction in each branch the same.

Common problem: Water flows through the two, parallel piping branches as shown in the diagram. Which of the two piping branches will carry more flow? Use nominal pipe diameters.


Related Discussions:- Parallel pipe systems or multipath pipeline problems

Staircase, The Figure 1 below shows a section through a stairway for a gara...

The Figure 1 below shows a section through a stairway for a garage in a new proposed dwelling. The stairway is 3 meters wide with 300 mm wide treads(7 treads) and 170 mm high riser

Water technology, Explain with lime soda process?cold lime soda process&hot...

Explain with lime soda process?cold lime soda process&hot lime soda process and it''s equations?

Plot vertical displacement - cantilever beam, 1. The cantilever beam-like s...

1. The cantilever beam-like structure  shown below is modeled  using  a 2 x 10 mesh of rectangular four-node plane stress elements of equal size. Do the following and compare with

Explain flash butt welding, Q. Explain Flash Butt welding? In this proc...

Q. Explain Flash Butt welding? In this process the ends of two rails are kept at fixed distance apart and a mould (designed to suit the rail section ) is fitted on. The rail en

Minimum volume of sump volume for pumps, Minimum volume of sump volume for ...

Minimum volume of sump volume for pumps Maximum pumping rate = Q P Volume of sump = V Inflow Rate = Q i Cycle Time T c = t 1 + t 2 t 1 = V / Q P - Q i t 2

Engineering economics, Ask quA contractor has both a 3-cy and a 5-cy shovel...

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki

Describe about the baur-leonhardt system, Describe about the Baur-Leonhardt...

Describe about the Baur-Leonhardt system The Baur-Leonhardt system is included in the third type of anchorages which work under the principle of looping tendon wires at the en

Define marine growth - underwater inspection of bridge, Define Marine growt...

Define Marine growth - underwater inspection of bridge? Generally, in seawater marine growth takes place. Acid generated by the marine growth attacks concrete. This can lead to

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd