What is consideration in selecting an orientation of wing walls in designing of bridge abutments?
Answer
There are three familiar arrangements of wing walls in bridge abutments based on Dr. Edmund C Hambly in1979- (i) Wing walls parallel to abutments -This is simplest and shortest time to make but is not most economical design. This design has plus points that it has least disturbance to active slope embankment.
(ii) Wing walls at an angle to abutments -This is most economical designing among three options in terms of material rate.
(iii) Wing walls perpendicular to abutments -Though it is not most economical design, wing walls provide a continuous alignment with bridge decks that provide supports to parapets. However, they reason disturbances to adjoining structures and value services during construction. Moreover, if bridge is curved, wing walls could hinder the road curvature. One other hand, when wing walls are structurally connected to an abutment, after that structural gain is able to be taken by steadiness of box structure.
Principal Stresses and Strains: Principal Stresses and Strains is a very important link in the analysis of solids so as to make sure safe design of different components of str
Determine the ultimate bearing capacity of a square footing, 1 m × 1 m, resting on saturated clay of unconfined compression strength of 180 kN/m 3 and a bulk density of 18 kN/m 3
Explain the Damage inspections - underwater inspection of bridge? Sometimes referred to as post-event inspections, damage inspections are typically unscheduled inspections aime
Transition Curves: If a vehicle travelling on a straight enters a horizontal curve abruptly, it will cause shock and sway. To avoid this, it is customary to provide a transit
i would like to get a project done. I have some plans and I need a cost estimate on how much it will cost to get it constructed.
The 6 monthly payment application for the construction of a $70,000,000 University dormitory is analyzed and the summary accounting show: the budgeted cost of work performed is $14
Convert the azimuth reading of 273.34º to a land bearing: Solution: Convert 273.34º to degrees minutes and seconds = 273º 20' 24" Next, convert the angle to orient to IV
spiral curves?
Enumerate the term - Failure Due to Crushing of Concrete Over reinforced pre-stressed concrete members, provided with a large amount of pre-stressing steel or relatively small
Question In designing of service reservoirs, how should reservoir floors be designed to avoid leakage of water because of seasonal and shrinkage movements ? Answer I
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd