obstacle measurement.., Civil Engineering

Assignment Help:
..describe how u can obtain the length of an inacceble length of a land when a river cross it

Related Discussions:- obstacle measurement..

Prismatic compass, Figure, working,principle of prismatic compass

Figure, working,principle of prismatic compass

Calculate the pressure on the other end, Q. 50 liters per sec of water flow...

Q. 50 liters per sec of water flow in a horizontal pipeline which is 200m long and the centerline of which is 3 m above the datum line. The pipe tapers from 30 cm diameter to 20 cm

Protection of lorry on the line, i. On single line by one or two men as req...

i. On single line by one or two men as required following and proceeding the lorry at a distance of 600 m. on the BG and 400 m. on the MG & NG carrying a banner flag across the tra

Advantages and dis advantages of timber, WHAT ARE THE ADVANTAGES AND DISADV...

WHAT ARE THE ADVANTAGES AND DISADVANTAGES OF TIMBER FOR CIVIL ENGINEERING

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Explain beam-columns, Explain Beam-Columns 1. A specific case of a beam...

Explain Beam-Columns 1. A specific case of a beam subjected to:  Axial loading Strong axis flexural stress   2. The section is also pinned at both ends pe

Magnitude of torque - bending moment, Magnitude of torque - bending moment:...

Magnitude of torque - bending moment: A prismatic bar of hollow circular cross-section along with outer and inner diameters 100 mm and 80 mm correspondingly, carries a bending

Ground water, Two pumping wells 1,000 m away fully penetrate the same confi...

Two pumping wells 1,000 m away fully penetrate the same confined aquifer. One of the wells pumps at a rate of 1,240 m3/day. The second well pumps at 850 m3/day. If the aquifer has

Calculate the daily standard production rate of equipment, Calculate the Da...

Calculate the Daily Standard Production Rate of Equipment An excavator with a bucket capacity of 3-yd 3 has a standard operating cycle time of 40 seconds. The daily standard p

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd