Objective of long-term plans for technical loss reduction, Electrical Engineering

Assignment Help:

Objective of Long-Term Plans for Technical Loss Reduction

The primary objectives of strengthening and improvement of sub-transmission and distribution system in the long-term are to:

1. Reliability and ensure quality of supply to the consumers;

2. Bring it down technical losses to an optimal minimum value; and

3. Phase a system expansion for match a growing power demand in the area under study.

A Sub-Transmission and Distribution system have to be properly planned within the long-term to ensure in which the losses are inside acceptable limits.


Related Discussions:- Objective of long-term plans for technical loss reduction

History - field-effect transistor, History - Field-Effect Transistor: ...

History - Field-Effect Transistor: The principle of field-effect transistors was very first patented by Julius Edgar Lilienfeld in the year 1925 and by Oskar Heil in the year

Voltage divider with ac bypasses capacitor, Voltage divider with AC bypasse...

Voltage divider with AC bypasses capacitor: Figure: Voltage divider with capacitor The standard voltage divider circuit that is discussed above faces a drawback - A

Determine the capacitance length of a pcb embedded stripline, 1. Determine ...

1. Determine the capacitance length of a PCB embedded stripline, assuming no fringing of the electrostatic field. 2. Determine the capacitance/unit length of the same embedded stri

Potentiometers , Which potentiometer do I need to control; 6v 2amps dc?

Which potentiometer do I need to control; 6v 2amps dc?

DLD, Draw a logic diagram to implement F=ABCDE using only 3 input AND gates...

Draw a logic diagram to implement F=ABCDE using only 3 input AND gates

Merits and demerits of fixed bias with emitter resistor, Merits: The ci...

Merits: The circuit has the trend to stabilize operating point against changes in temperature and β-value. Demerits: In this type of circuit, to keep I C  independent o

Determine the resultant line current and power factor, Q. A three-phase loa...

Q. A three-phase load, connected to a 440-V bus, draws 120 kWat a power factor of 0.85 lagging. In parallel with this load is a three-phase capacitor bank that is rated 50 kVAR . D

Bidirectional shift register, Design 2-bit bidirectional shift register? ...

Design 2-bit bidirectional shift register? ## A list of ten 8-bit numbers is located at address $5000. Write a 68000 Assembly program (flowchart and code) to sort those numbe

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd