Objective of long-term plans for technical loss reduction, Electrical Engineering

Assignment Help:

Objective of Long-Term Plans for Technical Loss Reduction

The primary objectives of strengthening and improvement of sub-transmission and distribution system in the long-term are to:

1. Reliability and ensure quality of supply to the consumers;

2. Bring it down technical losses to an optimal minimum value; and

3. Phase a system expansion for match a growing power demand in the area under study.

A Sub-Transmission and Distribution system have to be properly planned within the long-term to ensure in which the losses are inside acceptable limits.


Related Discussions:- Objective of long-term plans for technical loss reduction

Fet parameters, FET Parameters A basic, low-frequency hybrid-pi model ...

FET Parameters A basic, low-frequency hybrid-pi model for the MOSFET is displayed in figure. The several parameters are as follows. is the transconductance in siemens

What are the various tones used in stronger telephony, Q. What are the vari...

Q. What are the various tones used in stronger telephony? When called party line is obtained, exchange control equipment transmits out the ringing current to telephone set of t

Passive filters, Passive filters: Passive implementations of linear fi...

Passive filters: Passive implementations of linear filters are based upon combinations of inductors (L), resistors (R), and capacitors (C). These sorts are collectively termed

What do you mean by frequency response, Q. What do you mean by Frequency re...

Q. What do you mean by Frequency response? Now let us examine the response of a circuit to a sinusoidal source, called an oscillator, whose frequency can be varied.Known as the

State the principle of operation of a capacitor, a. Describe why a three-ph...

a. Describe why a three-phase induction motor rotates always with a speed less than the synchronous speed. b. State the principle of operation of a capacitor start single-phase

Reporting requirements for distribution licensees, Reporting Requirements f...

Reporting Requirements for Distribution Licensees Distribution licensees are needs to provide operational reports, commercial reports, financial reports, energy audit reports

Connection of shunt capacitors at distribution transformer, Connection of ...

Connection of Shunt Capacitors at  Distribution Transformer Provision of capacitors at load point is found to be hard in practice because of the additional investments needed.

Enhancement operation of p-channel enhancement mosfet, Q. Show the Enhancem...

Q. Show the Enhancement operation of p-channel enhancement mosfet? As the gate terminal is insulated from the channel by the silicon dioxide layer, we can also apply a negative

List out the reasons for automation, Describe the term (i) Automation ...

Describe the term (i) Automation (ii) Automated lines 04 List out the reasons for automation and discuss in detail the process of work part transport.

Electrical engineering, 4. Modify the circuit designed for question 3 to pr...

4. Modify the circuit designed for question 3 to provide an emergency stop which will park both cylinders in the extended position (i.e. A + B +). 5. Modify the circuit designed fo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd