Numericals on settlement of foundation, Civil Engineering

Assignment Help:
A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The clay layer overlies hard rock. Liquid limit of clay is 54%, water content 40.5%, and grain specific gravity is 2.70. The saturated unit weight of dense sand is 18.9 kN/m3. Estimate the ultimate settlement due to consolidation of the clay layer, suppose the site to be flooded.


Related Discussions:- Numericals on settlement of foundation

Define project scheduling - types of methods, Define Project Scheduling - T...

Define Project Scheduling - Types of Methods Project Scheduling - Distinction between the Major Types of Schedule Diagrams Precedence Diagrams (PDM)   a) Activ

Show the limitations of grillage analysis, Q. Show the Limitations of grill...

Q. Show the Limitations of grillage analysis? In designing the number of cells for concrete box girder bridges, in case depth of a box girder bridge exceeds 1/6 or 1/5 of bridg

Explain the runoff, Explain the Runoff RUNOFF: Flowing water from preci...

Explain the Runoff RUNOFF: Flowing water from precipitation or snow melt which travels overland by gravity to a depression, stream or other body of water.

Mass effect, how the effective mass of charge carrier less than the rest ma...

how the effective mass of charge carrier less than the rest mass

Water absorption test for precast concrete pipes, Purpose of carrying out w...

Purpose of carrying out water absorption test for precast concrete pipes Cement will mix with more water than is essential to ultimately combine during hydration of cement pas

Determine the sweep angles and coordinates, This is more likely in to Aeros...

This is more likely in to Aerospace engineering.. So if there's anyone whose doing his/her major or have any skills regarding that field please help me with this problem. :) a)

Immersed tube method for underwater crossings, Immersed tube method for und...

Immersed tube method for underwater crossing includes the following basic construction steps: (i)  Prefabricating long tunnel units (concrete orsteel shell) in a dry-dock or shi

Hydraulics, What is the head loss in 350 ft of 12 inch diameter 20 years ol...

What is the head loss in 350 ft of 12 inch diameter 20 years old cast iron pipe carrying 1.2 MGD?

Principal stresses and strains, Principal Stresses and Strains: Princi...

Principal Stresses and Strains: Principal Stresses and Strains is a very important link in the analysis of solids so as to make sure safe design of different components of str

Tack rivet, tack rivet figures with connections

tack rivet figures with connections

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd